Statistics:-

Plan Head

NEW LINE

PIU      

GM P-1

Rly.

NR

Executing Agency

RVNL

State

Uttrakhand

Funding Source

CAPDM

Length (Km)

125

Status

Under Development Stage.

GQ/PC

Golden Qudilateral 

Anticipated Cost (Cr.)

4295.3

 

Project Brief:-

Entire Project alignment from Rishikesh to Karanprayag (125.20 Kms) lies between Longitude 78.015’E to 79.015’E and Latitude 30.005’N to 30.020’N in Garhwal Himalayan range, Uttarakhand.

FLS works have been completed for the project in three stages consisting of:-

Stage-I:- Creation of digital elevation model of the terrain of project area and design & study of alignment options

Stage-II:- Geological survey (1:25000 medium scale) along the alignment approved in stage-I and consequent refinement of the alignment

Stage-III:- Detailed geological survey (1:5000 large scale), geo-physical survey along alignment refined in Stage-II, further refinement wherever necessary and staking of the final alignment in the field.

Construction work of the project will be starting by 2017.

 

Major Challenges:-

·         84.24% (105.47 km) of the total length 125.20 km comprises of tunnels.

·         13.49% Embankment will be required

·         35 bridges in the route length
 