| ID |
Subject |
Date & Time |
If Updated |
Download |
| 20080003 | Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction OHE, Switching Stns and other associated works between Nandalur and Kondapuram and Supply, Installation, Testing and Commissioning of S&T Equipment with Electronic I | Opening Date 27-01-2008
Closing Date & Time 22-04-2008 11.00 AM |  11-04-2008 |  Download File |
| 20080004 | Hiring commercial vehicles for its official uses in the Corporate Office within Delhi and NCR Region on monthly and daily rates | Opening Date 12-02-2008
Closing Date & Time 12-03-2008 14.00 PM |  28-03-2008 |  Download File |
| 20080005 | Supply, erection, testing and commissioning of four nos. Service Elevators/Lifts and one number 63 KVA silence DG set in two numbers (G+8) multistoried staff quarters at Bhubaneswar station area under the jurisdiction of Khurda Road division of ECR. | Opening Date 15-02-2008
Closing Date & Time 02-04-2008 05.00 PM |  14-03-2008 |  Download File |
| 20080006 | Supply Of Solar Panel Based Charging System In Connection With MG To BG Conversion On Rewari-Reengus-Phulera-Ajmer Section Of NWR. | Opening Date 20-02-2008
Closing Date & Time 21-03-2008 05.00 PM |  29-04-2008 |  Download File |
| 20080007 | Provision of signalling arrangements at Idappalli Yard (remodeling work), Kerala in connection with rail connectivity from Idappalli to International Container Transhipment Terminal, Vallarpadam | Opening Date 03-03-2008
Closing Date & Time 18-03-2008 05.00 PM |  12-03-2008 |  Download File |
| 20080008 | Conducting FLS, marking centre line for final alignment on ground, preparation of connected drawings and approval for doubling between Daund-Gulbarga (225.00 Kms) on Solapur Division of CR. | Opening Date 05-03-2008
Closing Date & Time 16-05-2008 05.00 PM |  28-04-2008 |  Download File |
| 20080009 | Conducting FLS, marking centre line for final alignment on ground, preparation of connected drawings and approval for doubling between Hospet Tiniaghat (245.00 Km) on SWR. | Opening Date 05-03-2008
Closing Date & Time 16-05-2008 05.00 PM |  28-04-2008 |  Download File |
| 20080010 | Final Location Survey, marking centre line for final alignment on ground, preparation of connected drawings and approval for doubling between Raipur Titlagarh (203.00 Km) on Sambalpur Division of ECoR. | Opening Date 05-03-2008
Closing Date & Time 16-05-2008 05.00 PM |  29-04-2008 |  Download File |
| 20080011 | Detailed design Engineering (Electrical & Civil) for Railway Electrification of Pune -Bhigwan - Gulbarga (103 RKM Double line/273 RKM Single line) Section in CR. | Opening Date 05-03-2008
Closing Date & Time 15-05-2008 05.00 PM |  01-05-2008 |  Download File |
| 20080012 | Gauge Conversion of Attur Salem section Residual Civil Works. | Opening Date 04-03-2008
Closing Date & Time 25-03-2008 05.00 PM |  25-03-2008 |  Download File |
| 20080013 | Gauge Conversion of Villupuram Mayiladuturai section of Southern Railway - Proposed provision of miscellaneous Civil Engineering works between Sirkazhi and Mayiladuturai. | Opening Date 04-03-2008
Closing Date & Time 25-03-2008 05.00 PM |  20-03-2008 |  Download File |
| 20080014 | SUPPLY AND INSTALLATION OF DG SETS 15 KVA IN CONNECTION WITH MG TO BG CONVERSION ON REWARI-RINGUS-PHULERA-AJMER SECTION OF NORTH WESTERN RAILWAY. | Opening Date 28-03-2008
Closing Date & Time 25-04-2008 05.00 PM |  09-04-2008 |  Download File |
| 20080015 | Conducting FLS, deciding final alignment, marking centre line for final alignment on ground, DDE, preparation of drawings and approval from RVNL/ Railways for rail connectivity (26.10 kms) to the proposed Rewas Port near Rewas Village in Raigarh Distric | Opening Date 30-03-2008
Closing Date & Time 16-05-2008 11.00 AM |  28-04-2008 |  Download File |
| 20080016 | Detailed Design Engineering (Electrical, Civil) for Railway Electrification of Guntakal (excl) Raichur-Wadi (excl) and Wadi(excl) Gulbarga(incl) (265 RKM) (including patch doubling line section) in Guntakal Divn. on SCR and Solapur Divn. of CR. | Opening Date 02-04-2008
Closing Date & Time 14-05-2008 11.00 AM |  30-04-2008 |  Download File |
| 20080017 | Construction of roadbed, major & minor bridges & track linking (excl supply of rails, sleepers, turn out sleepers & thick webs switches) including S&T and OHE & Gen. Elect. work in connection with 3rd line between Jakhapura-Haridaspur (25.0 km) on KUR Div | Opening Date 04-04-2008
Closing Date & Time 21-05-2008 05.00 PM |  09-05-2008 |  Download File |
| 20080018 | Supply, erection, testing and commissioning of 25 KV/240V, 25 KVA oil filled, out door type auxiliary transformers, XLPE cables, CLS panels and their accessories for the section of Khurda Road-Barang-Rajathgarh/Cuttack in connection with 3rd line/doubling | Opening Date 09-04-2008
Closing Date & Time 29-05-2008 05.00 PM |  29-04-2008 |  Download File |
| 20080019 | Supply,erection,testing & commissioning of XLPE Armoured cables & its accessories for commissioning of 10 KVA, 25/0.240 KV outdoor type auxiliary transformers & CLS works at 14 Stns in Tomka Jaroli Sec, under KUR Div. on ECoR. | Opening Date 16-04-2008
Closing Date & Time 15-05-2008 05.00 PM |  28-04-2008 |  Download File |
| 20080020 | Welding of 90 R rails into short welded panels/long welded panels on loop lines in Station Yards (RDSO) approved firms only should apply) | Opening Date 18-04-2008
Closing Date & Time 10-05-2008 05.00 PM | |  Download File |
| 20080021 | Manufacture and supply of prestressed concrete sleepers for 1 in 16 turnout pretensioned type to BG 60 kg / 52 kg to RDSO Drg. No.T.5691. | Opening Date 18-04-2008
Closing Date & Time 10-05-2008 05.00 PM | |  Download File |
| 20080022 | Additional Civil Works between Villupuram and Cuddalore Port Junction. | Opening Date 18-04-2008
Closing Date & Time 16-05-2008 05.00 PM |  06-05-2008 |  Download File |
| 20080023 | Additional Civil Works between Cuddalore Port Junction and Mayiladuturai. | Opening Date 18-04-2008
Closing Date & Time 16-05-2008 05.00 PM |  06-05-2008 |  Download File |
| 20080024 | Gauge Conversion of Garhi Harsaru Farukhnagar MG railway line to BG line incl. all civil works, road bed & p.way and left over works of Delhi-Rewari GC (2nd Line). | Opening Date 25-04-2008
Closing Date & Time 26-05-2008 11.30 AM | |  Download File |
| 20080025 | Design,Supply,Erection,Testing & Commissioning of 132/25 & 220/25 kV Traction Sub-stations, Feeding posts, Shunt Capacitor Bank & other associated works at Kadapa(132/25kV), Muddanur(132/25kV), Tadipatri(132/25kV) & Gooty(220/25kV) stns of Nandalur Gunt | Opening Date 02-05-2008
Closing Date & Time 16-06-2008 11.00 AM |  13-05-2008 |  Download File |
| 20080026 | PMC for Supply, Erection, Testing & Commissioning of 25 kV AC, 50 Hz, single Ph, traction OHE & other associated works in connection with RE, of Tomka-Jaroli (144 RKM/180 TKM) single line Sec. of KUR Div of ECoR. | Opening Date 12-05-2008
Closing Date & Time 11-06-2008 05.00 PM | |  Download File |
| 20080027 | PMC for Supply, Erection, Testing & Commissioning of 25 KV A.C single phase 50 HZ Traction OHE, Switching Stns., Traction Sub stns, SCADA, S&T works and other associated Civil Works in NRE (Excl) GTL (Incl) Sec. in Guntakal Divn of SCR. | Opening Date 10-05-2008
Closing Date & Time 25-06-2008 11.00 AM | |  Download File |