Active Tenders

ID Subject Date & Time If Updated Download
20140042

“EXECUTION OF ROADBED WITH EARTHWORK AND MINOR BRIDGES BETWEEN KM.0 TO KM.19 AND KM.47 TO KM.97 FOR 76 ROUTE KM. INCLUDING TIE LINES AT BOTH ENDS, LAYING OF BLANKET IN ENTIRE LENGTH OF 104 ROUTE KM. BETWEEN BUDHAPANK TO BAGHUAPAL UNDER ANGUL TO SUKINDA NEW BG RAIL LINE IN STATE OF ODISHA,INDIA”.

Opening Date
25-07-2014

Closing Date
& Time

29-09-2014
17.00 PM
 


09-09-2014

Download File
20140043

“CONSTRUCTION OF SHEDS, STRUCTURES, BUILDINGS, OVER HEAD TANK WITH WATER SUPPLY ARRANGEMENT, DRAINAGE, ROAD, TRACK WORKS, SIGNALING & TELECOMMUNICATION, POWER SUPPLY ARRANGEMENT, OHE, GENERAL ELECTRICAL WORKS AND SUPPLY, ERECTION & COMMISSIONING OF MACHINERY & PLANT IN CONNECTION WITH SETTING UP OF POH WORKSHOP FOR ELECTRIC LOCOMOTIVES AT DABHOI, VADODARA, GUJARAT (INDIA).”

Opening Date
31-07-2014

Closing Date
& Time

31-12-2014
17.00 PM
 


21-11-2014

Download File
20140048

CONSULTANCY SERVICES FOR

BHANUPALLI-BILASPUR-BERI NEW BG RAIL LINE PROJECT

Opening Date
11-08-2014

Closing Date
& Time

17-11-2014
05.00 PM
 


24-10-2014

Download File
20140050
 
“Providing Six (06) commercially registered vehicles for RVNL officials 
 
for use within the state of Uttarakhand and neighboring states of Uttar 
 
Pradesh, Himachal Pradesh, Haryana and NCR of Delhi on hiring basis for 
 
one year”.
Opening Date
27-08-2014

Closing Date
& Time

25-09-2014
05.00 PM
 


27-08-2014

Download File
20140051

“Execution of 26 Nos of Major Bridges including 3 nos of Bridges with steel girders,12 nos of Bridges with PSC girders and 11 Nos of bridges with RCT-beam girders between Budhapank to Baghuapal including tie lines to Talcher Road and Tomka Railway station under Angul-Sukinda New BG Rail line in state of Odisha, India”.

Opening Date
29-08-2014

Closing Date
& Time

21-10-2014
05.00 PM
 


01-10-2014

Download File
20140052

‘Hospet-Tinaighat doubling- Dismantling of existing ROB 1x7.89 m RCC  and Reconstruction as 1 x 24 m Steel Through Truss Composite Girder  excluding approach works at Km 469.594 between Hubli and Unkal stations on Hubli Division of South Western Railway in Dharwad District,  Karnataka State, India’.

RVNL/Bangalore/Hospet-Tinaighat/2014/ OT 03 dated 01.09.2014

Opening Date
01-09-2014

Closing Date
& Time

08-10-2014
17.00 PM
 
Download File
20140053

Project Management Consultancy for the “Railway Electrification work of Bhigvan – Solapur 160 RKM/385 TKM and Solapur – Gulbarga 113 RKM/261 TKM (Section of Pune – Wadi – Guntakal RE work) section in Solapur Division of Central Railway in the state of Maharashtra & Karnataka, India. 

 
Opening Date
02-09-2014

Closing Date
& Time

23-04-2015
05.00 PM
 


17-11-2014

Download File
20140054

Execution of Doubling of track between Samakhiyali and Kidiyanagar  and between Bhildi and Diyodar– Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails), Electrical (General Electrification), Signalling and Telecommunication works in Ahmedabad Division of Western Railway, Gujarat, India in 2 (Two) Packages

Opening Date
04-09-2014

Closing Date
& Time

20-10-2014
05.00 PM
 


30-09-2014

Download File
20140055

“PROVIDING EARTH WORK IN FORMATION, CONSTRUCTION OF TOE WALL, EXTENSION OF MINOR BRIDGES, LAYING AND LINKING OF TRACK FOR LINE NO. 05, 06, AND SHUNTING NECK,  CONSTRUCTION OF GOODS PLATFORM BETWEEN LINE NO.05 & 06 AT DAHEJ IN CONNECTION WITH BHARUCH-DAHEJ GAUGE CONVERSION PROJECT IN VADODARA DIVISION OF WESTERN RAILWAY IN GUJARAT STATE, INDIA.”

 
Opening Date
05-09-2014

Closing Date
& Time

29-10-2014
17.00 PM
 


19-09-2014

Download File
20140056

Track Linking (excluding supply of rails) in connection with quadrupling between Kadambathur and Tiruvalangadu as part of 4th line between Tiruvallur and Arakkonam in Chennai Division of Southern Railway in Tamilnadu, India.

Opening Date
17-09-2014

Closing Date
& Time

17-10-2014
05.00 PM
 


01-10-2014

Download File
20140057

Signalling arrangements between Tirvuallur and Tiruvalangadu in connection with the proposed 4th Line between Tiruvallur and Arakkonam in Southern Railway, Tamil Nadu

 
Opening Date
18-09-2014

Closing Date
& Time

30-10-2014
05.00 PM
 


27-10-2014

Download File
20140058

Provision of Doubling of track between Thanjavur – Ponmalai (46.96 KM)–Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails and track sleepers), Electrical (General Electrification), Modification of OHE, Signalling and Telecommunication works in Tiruchchirappalli Division of Southern Railway, Tamil Nadu.

 
Opening Date
19-09-2014

Closing Date
& Time

03-11-2014
05.00 PM
 


29-10-2014

Download File
20140059

Execution of Gauge Conversion of existing Meter Gauge track  between Sabarmati and Botad: Construction of roadbed, bridges, supply of ballast,Dismantling of existing MG track, Installation of track (excluding supply of rails & ordinary PSC line sleepers), Electrical (General Electrification), Signaling and Telecommunication works of Ahmedabad & Bhavnagar Divisions of Western Railway, Gujarat, India in 2 (Two) Packages

Opening Date
23-09-2014

Closing Date
& Time

27-11-2014
05.00 PM
 


05-11-2014

Download File
20140060

“Supply, Installation, Testing and commissioning of indoor and outdoor signaling & Telecommunication Systems on Dallirajhara – Dondi Block Section (17 km Approx) involving Dallirajhara and Dondi stations in connection with provision of new line on DRZ – ROW section in Raipur Division of SECR in Chhattisgarh state.

Opening Date
24-09-2014

Closing Date
& Time

05-12-2014
05.00 PM
 


18-11-2014

Download File
20140061

Providing Consultancy services for Geotechnical investigation, Detailed designing, preparing GADs and Structural drawings for Bridges, buildings etc. by collecting required field data including survey for Signaling & Telecommunication works and General Electrical work and other allied works as per the schedule in connection with Doubling of Palanpur – Samakhiyali section (247.73 Kms) in Ahmedabad Divisions of Western Railway in the state of Gujarat

Opening Date
24-09-2014

Closing Date
& Time

08-11-2014
05.00 PM
 


17-10-2014

Download File
20140063

Balance works of Supply ,Installation, Testing and Commissioning of Distributed Electronic Interlocking systems, and, Supply & Execution of Indoor and Outdoor Signalling & Telecom works in connection with doubling between Salka Road-Khongsara (25.8 Km) and Khodri-Jaithari (47.8 Km) on Bilaspur Division of South East Central Railway in Chhattisgarh and Madhya Pradesh States of India

Opening Date
07-10-2014

Closing Date
& Time

05-12-2014
05.00 PM
 


14-11-2014

Download File
20140064

Project Management Consultancy services for the work of “Construction of Sheds, Structures, Water Supply Arrangement, Drainage, Road, Track, Power Supply Arrangement, General Electrical Works and Supply, Erection & Commissioning of Machinery & Plants in Connection with Augmentation of Production Capacity at Diesel Locomotive Works, Varanasi, Uttar Pradesh (India)”

Opening Date
20-10-2014

Closing Date
& Time

04-12-2014
05.00 PM
 


11-11-2014

Download File
20140065

“EXECUTION OF WORKS OF ROADBED, MAJOR AND MINOR BRIDGES, SUPPLY OF BALLAST, RESIDENTIAL AND SERVICE BUILDINGS, PLATFORM, TRANSPORTATION OF MATERIALS,  GENERAL ELECTRICAL ETC., FOR DONDI -  KEOTI SECTION (i.e.. FROM 17.6 KM.TO 42.6 KM – TOTAL LENGTH - 25 KMS) IN CONNECTION WITH DALLIRAJHARA – ROWGHAT NEW B.G. RAIL LINE PROJECT IN RAIPUR DIVISION OF SOUTH EAST CENTRAL RAILWAY IN THE STATE OF CHATTISGARH, “INDIA”

Opening Date
30-10-2014

Closing Date
& Time

09-12-2014
05.00 PM
 


17-11-2014

Download File
20140066

CONSTRUCTION OF MAJOR BRIDGE OVER RIVER CHANDERBAGHA, ROB AND RUB WITH APPROACHES AT ROAD CROSSINGS IN VIRBHADRA-NEW RISHIKESH- SHIVPURI SECTION OF RISHIKESH-KARANPRAYAG NEW BG RAIL LINE PROJECT IN THE STATE OF UTTARAKHAND, INDIA

Opening Date
30-10-2014

Closing Date
& Time

09-12-2014
05.00 PM
 
Download File
20140067

‘Supply, installation, testing and commissioning of indoor signaling works in connection with the work of doubling between Bina – Guna and Ruthiyai – Kota section of Bhopal and Kota Division respectively in the state of Madhya Pradesh and Rajasthan, India’.

Opening Date
05-11-2014

Closing Date
& Time

22-12-2014
05.00 PM
 
Download File
20140068

Construction of Sheds, Structures, Buildings, Water Supply Arrangement, Drainage, Road, Power Supply Arrangement, General Electrical Works and Supply, Erection & Commissioning of Machinery & Plant in connection with setting up of FIAT Bogie Manufacturing Unit at Yadgir, Karnataka (India)

Opening Date
14-11-2014

Closing Date
& Time

09-01-2015
05.00 PM
 
Download File
20140069

Project Management Consultancy for Provision of Doubling of track between Thanjavur – Ponmalai (46.96 KM) – Construction of roadbed, bridges, supply of ballast, Platforms, Buildings, Installation of track (excluding supply of rails and Track Sleepers), Electrical (General Electrification), Modification of OHE, Signaling and Telecommunication works in Tiruchchirappalli Division of Southern Railway, Tamil Nadu, India.

 
Opening Date
14-11-2014

Closing Date
& Time

23-12-2014
05.00 PM
 
Download File
20140070

Project Management Consultancy for “Construction of Roadbed, Bridges, Installation of track, Modification to station yards, Construction of passenger amenities, Signalling & Telecommunication works (Indoor & Outdoor), Railway Electrification and General Electrical works for third track between Habibganj (incl) to Barkhera (incl) (41.42 KM)and Budni (incl) to Itarsi (incl) (25.09 KM)on Bhopal – Itarsi section of Bhopal Division of West Central Railway, Madhya Pradesh, India”.

Opening Date
17-11-2014

Closing Date
& Time

01-01-2015
05.00 PM
 
Download File