Home » Tenders » Active Tenders

Active Tenders

ID Subject Date & Time If Updated Download
20080003“Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction OHE, Switching Stns and other associated works between Nandalur and Kondapuram and Supply, Installation, Testing and Commissioning of S&T Equipment with Electronic IOpening Date
27-01-2008

Closing Date
& Time

22-04-2008
11.00 AM
 
11-04-2008

Download File
20080004Hiring commercial vehicles for its official uses in the Corporate Office within Delhi and NCR Region on monthly and daily ratesOpening Date
12-02-2008

Closing Date
& Time

12-03-2008
14.00 PM
 
28-03-2008

Download File
20080005Supply, erection, testing and commissioning of four nos. Service Elevators/Lifts and one number 63 KVA silence DG set in two numbers (G+8) multistoried staff quarters at Bhubaneswar station area under the jurisdiction of Khurda Road division of ECR.Opening Date
15-02-2008

Closing Date
& Time

02-04-2008
05.00 PM
 
14-03-2008

Download File
20080006Supply Of Solar Panel Based Charging System In Connection With MG To BG Conversion On Rewari-Reengus-Phulera-Ajmer Section Of NWR.Opening Date
20-02-2008

Closing Date
& Time

21-03-2008
05.00 PM
 
29-04-2008

Download File
20080007Provision of signalling arrangements at Idappalli Yard (remodeling work), Kerala in connection with rail connectivity from Idappalli to International Container Transhipment Terminal, VallarpadamOpening Date
03-03-2008

Closing Date
& Time

18-03-2008
05.00 PM
 
12-03-2008

Download File
20080008Conducting FLS, marking centre line for final alignment on ground, preparation of connected drawings and approval for doubling between Daund-Gulbarga (225.00 Kms) on Solapur Division of CR.Opening Date
05-03-2008

Closing Date
& Time

16-05-2008
05.00 PM
 
28-04-2008

Download File
20080009Conducting FLS, marking centre line for final alignment on ground, preparation of connected drawings and approval for doubling between Hospet – Tiniaghat (245.00 Km) on SWR.Opening Date
05-03-2008

Closing Date
& Time

16-05-2008
05.00 PM
 
28-04-2008

Download File
20080010Final Location Survey, marking centre line for final alignment on ground, preparation of connected drawings and approval for doubling between Raipur – Titlagarh (203.00 Km) on Sambalpur Division of ECoR.Opening Date
05-03-2008

Closing Date
& Time

16-05-2008
05.00 PM
 
29-04-2008

Download File
20080011Detailed design Engineering (Electrical & Civil) for Railway Electrification of Pune -Bhigwan - Gulbarga (103 RKM Double line/273 RKM Single line) Section in CR.Opening Date
05-03-2008

Closing Date
& Time

15-05-2008
05.00 PM
 
01-05-2008

Download File
20080012Gauge Conversion of Attur – Salem section – Residual Civil Works.Opening Date
04-03-2008

Closing Date
& Time

25-03-2008
05.00 PM
 
25-03-2008

Download File
20080013Gauge Conversion of Villupuram – Mayiladuturai section of Southern Railway - Proposed provision of miscellaneous Civil Engineering works between Sirkazhi and Mayiladuturai.Opening Date
04-03-2008

Closing Date
& Time

25-03-2008
05.00 PM
 
20-03-2008

Download File
20080014SUPPLY AND INSTALLATION OF DG SETS 15 KVA IN CONNECTION WITH MG TO BG CONVERSION ON REWARI-RINGUS-PHULERA-AJMER SECTION OF NORTH WESTERN RAILWAY.Opening Date
28-03-2008

Closing Date
& Time

25-04-2008
05.00 PM
 
09-04-2008

Download File
20080015Conducting FLS, deciding final alignment, marking centre line for final alignment on ground, DDE, preparation of drawings and approval from RVNL/ Railways for rail connectivity (26.10 kms) to the proposed Rewas Port near Rewas Village in Raigarh DistricOpening Date
30-03-2008

Closing Date
& Time

16-05-2008
11.00 AM
 
28-04-2008

Download File
20080016Detailed Design Engineering (Electrical, Civil) for Railway Electrification of Guntakal (excl) – Raichur-Wadi (excl) and Wadi(excl) – Gulbarga(incl) (265 RKM) (including patch doubling line section) in Guntakal Divn. on SCR and Solapur Divn. of CR.Opening Date
02-04-2008

Closing Date
& Time

14-05-2008
11.00 AM
 
30-04-2008

Download File
20080017Construction of roadbed, major & minor bridges & track linking (excl supply of rails, sleepers, turn out sleepers & thick webs switches) including S&T and OHE & Gen. Elect. work in connection with 3rd line between Jakhapura-Haridaspur (25.0 km) on KUR DivOpening Date
04-04-2008

Closing Date
& Time

21-05-2008
05.00 PM
 
09-05-2008

Download File
20080018Supply, erection, testing and commissioning of 25 KV/240V, 25 KVA oil filled, out door type auxiliary transformers, XLPE cables, CLS panels and their accessories for the section of Khurda Road-Barang-Rajathgarh/Cuttack in connection with 3rd line/doublingOpening Date
09-04-2008

Closing Date
& Time

29-05-2008
05.00 PM
 
29-04-2008

Download File
20080019Supply,erection,testing & commissioning of XLPE Armoured cables & its accessories for commissioning of 10 KVA, 25/0.240 KV outdoor type auxiliary transformers & CLS works at 14 Stns in Tomka – Jaroli Sec, under KUR Div. on ECoR.Opening Date
16-04-2008

Closing Date
& Time

15-05-2008
05.00 PM
 
28-04-2008

Download File
20080020Welding of 90 R rails into short welded panels/long welded panels on loop lines in Station Yards (RDSO) approved firms only should apply)Opening Date
18-04-2008

Closing Date
& Time

10-05-2008
05.00 PM
 
Download File
20080021Manufacture and supply of prestressed concrete sleepers for 1 in 16 turnout pretensioned type to BG 60 kg / 52 kg to RDSO Drg. No.T.5691.Opening Date
18-04-2008

Closing Date
& Time

10-05-2008
05.00 PM
 
Download File
20080022Additional Civil Works between Villupuram and Cuddalore Port Junction.Opening Date
18-04-2008

Closing Date
& Time

16-05-2008
05.00 PM
 
06-05-2008

Download File
20080023Additional Civil Works between Cuddalore Port Junction and Mayiladuturai.Opening Date
18-04-2008

Closing Date
& Time

16-05-2008
05.00 PM
 
06-05-2008

Download File
20080024Gauge Conversion of Garhi Harsaru – Farukhnagar MG railway line to BG line incl. all civil works, road bed & p.way and left over works of Delhi-Rewari GC (2nd Line).Opening Date
25-04-2008

Closing Date
& Time

26-05-2008
11.30 AM
 
Download File
20080025Design,Supply,Erection,Testing & Commissioning of 132/25 & 220/25 kV Traction Sub-stations, Feeding posts, Shunt Capacitor Bank & other associated works at Kadapa(132/25kV), Muddanur(132/25kV), Tadipatri(132/25kV) & Gooty(220/25kV) stns of Nandalur – GuntOpening Date
02-05-2008

Closing Date
& Time

16-06-2008
11.00 AM
 
13-05-2008

Download File
20080026PMC for “Supply, Erection, Testing & Commissioning of 25 kV AC, 50 Hz, single Ph, traction OHE & other associated works in connection with RE, of Tomka-Jaroli (144 RKM/180 TKM) single line Sec. of KUR Div of ECoR.Opening Date
12-05-2008

Closing Date
& Time

11-06-2008
05.00 PM
 
Download File
20080027PMC for Supply, Erection, Testing & Commissioning of 25 KV A.C single phase 50 HZ Traction OHE, Switching Stns., Traction Sub stns, SCADA, S&T works and other associated Civil Works in NRE (Excl) – GTL (Incl) Sec. in Guntakal Divn of SCR.Opening Date
10-05-2008

Closing Date
& Time

25-06-2008
11.00 AM
 
Download File