Home » Tenders » Active Tenders

Active Tenders

ID Subject Date & Time If Updated Download
20110065

SINGLE STAGE TWO PACKET SYSTEM for two (02) contract packages as under: 

PACKAGE - JMS1:  CONSTRUCTION OF JOKA, THAKURPUKUR, SAKHER BAZAR AND BEHALA CHOWRASTA STATIONS INCLUDING ALL RELATED WORKS (ARCHITECTURE, ELECTRICAL & MECHANICAL (E&M), HVAC, FIRE DETECTION AND FIRE SUPPRESSION SYSTEM AND PUBLIC HEALTH ENGINEERING WORKS), IN JOKA-BBD BAG CORRIDOR OF KOLKATA METRO RAILWAY LINE.

 

PACKAGE - JMS2: CONSTRUCTION OF BEHALA BAZAR, TARATALA AND MAJERHAT STATIONS INCLUDING ALL RELATED WORKS (ARCHITECTURE, ELECTRICAL & MECHANICAL (E&M), HVAC, FIRE DETECTION AND FIRE SUPPRESSION SYSTEM AND PUBLIC HEALTH ENGINEERING WORKS), IN JOKA-BBD BAG CORRIDOR OF KOLKATA METRO RAILWAY LINE.

 
Opening Date
08-12-2011

Closing Date
& Time

08-02-2012
05.00 PM
 


18-01-2012

Download File
20120001

Balance work of construction of Roadbed (including minor bridges and major bridges), facilities and general electrification for doubling of Railway line between Barang – Rajathgarh (17km), Cuttack – Barang (12 km) and 3rd line between Barang – Bhubaneswar (16 km) in the state of Orissa, India, excluding Ghantikal-Naraj.

 

Opening Date
22-01-2012

Closing Date
& Time

22-02-2012
05.00 PM
 


23-01-2012

Download File
20120002


Construction of roadbed, major and minor bridges, civil works and track linking (excluding supply of rails and sleepers), general electrical work and S&T works in connection with doubling between Rani- Keshavganj (59.5 km) on Ajmer Division of North Western Railway in Rajasthan, India

Approx Cost: Rs 167.43 Crs

Opening Date
28-01-2012

Closing Date
& Time

20-03-2012
11.00 AM
 
Download File
20120003

Execution of Doubling of track between Villupuram and Dindigul – Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails), Electrical (Railway Electrification and General Electrification), signalling and telecommunication works in Tiruchchirappalli and Madurai Divisions of Southern Railway, Tamil Nadu.

 

Package- 1 -   “Construction of Roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & PSC sleepers), Electrical (Railway Electrification and General Electrification), outdoor signalling and telecommunication works for Doubling of track between Valadi and Manaparai in Tiruchchirappalli and Madurai Divisions of Southern Railway, Tamil Nadu, India.”  

 

Package- 2 -   “Construction of Roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & PSC sleepers), Electrical (Railway Electrification and General Electrification), outdoor Signalling and telecommunication works for Doubling of track between Manaparai and Dindigul in Madurai Divisions of Southern Railway, Tamil Nadu, India.”

Opening Date
30-01-2012

Closing Date
& Time

15-03-2012
05.00 PM
 
Download File
20120004

(I)      RVNL/WALTAIR/SAMBALPUR-TITLAGARH, Package-1 -- “Construction of Roadbed, Major & Minor bridges, Track Linking (excluding supply of rails, ordinary track sleepers and thick web switches), Outdoor Signaling  and Electrical (General)  works in connection with Doubling of SAMBALPUR(IN) - BARPALI (IN) section( 61.585 Kms) part of SAMBALPUR -TITLAGARH Doubling in SAMBALPUR Division of East Coast Railway in the state of ORISSA, India.”   

 

(II)RVNL/ WALTAIR/SAMBALPUR-TITLAGARH, Package-2 -- “Construction of Roadbed, Major & Minor bridges, Track Linking (excluding supply of rails, ordinary track sleepers and thick web switches), Outdoor Signaling  and Electrical (General)  works in connection with Doubling of BARPALI (Ex) – BOLANGIR (IN) section(56.803 Kms) part of SAMBALPUR-TITLAGARH Doubling in SAMBALPUR Division of East Cost Railway in the states of ORISSA, India.”   

 

(III)    RVNL/ WALTAIR/SAMBALPUR-TITLAGARH, Package-3 -- “Construction of Roadbed, Major & Minor bridges, Track Linking (excluding supply of rails, ordinary track sleepers and thick web switches), Outdoor Signaling  and Electrical (General)  works in connection with Doubling of   BOLANGIR (Ex) –  TITLAGARH (IN) section(63.097 Kms) part of SAMBALPUR-TITLAGARH Doubling in SAMBALPUR Division of East Coast  Railway in the state of ORISSA, India.”

Opening Date
02-02-2012

Closing Date
& Time

21-03-2012
05.00 PM
 
Download File