Mar 08 2010 Status of Bills of Contractor Passed During The Period 27-02-2010 to 05-03-2010 Click here to View. |
| |
Mar 02 2010 Status of Bills of Contractor Passed During The Period 20-02-2010 to 26-02-2010 Click here to View. |
| |
Feb 22 2010 Status of Bills of Contractor Passed During The Period 13-02-2010 to 19-02-2010 Click here to View. |
| |
Feb 15 2010 Status of Bills of Contractor Passed During The Period 06-02-2010 to 12-02-2010 Click here to View. |
| |
Jun 02 2009 Empanelment of Doctors Empanelment of Doctors in Corporate Office, RVNL |
| |
Mar 03 2009 Master Management Information System maintained by Department of Public Enterprises concerning PSUs. Master Management Information System - Data for the period October to December 2008 |
| |
Nov 20 2008 VIGILANCE BULLETIN Vigilance Bulletin 2008 |
| |
Apr 28 2008 Code of Business Conduct and Ethics for Board Members and Senior Management Personnel of RVNL. Please download the file. |
| |
Aug 22 2007 Addendum/Corrigendums of RVNL Standard Specifications for S&T, Electrical Engineering and Civil Engineering Departments. Addendum/Corrigendum No. 1 to 6. |
| |
Mar 06 2007 NOTIFICATION OF AWARD FOR PROCUREMENT OF GOODS FUNDED BY ADB Please download NOTIFICATION OF AWARD FOR PROCUREMENT OF GOODS. |
| |
Jul 07 2006 SHORT RESETTLEMENT PLAN FOR RAJATGARH-BARANG RAILWAY LINE DOUBLING Short resettlement plan |
| |
Jul 07 2006 RESETTLEMENT PLAN DOUBLING OF RAILWAY LINE BETWEEN GOOTY-PULLAMPET IN ANDHRA PRADESH, INDIA Resettlement plan |
| |
Jul 06 2006 RESETTLEMENT PLAN CUTTACK - BARANG DOUBLING OF RAILWAY LINE PROJECT CUTTACK - BARANG DOUBLING OF RAILWAY LINE PROJECT |
| |
Oct 30 2005 RVNL Standard Specifications for Signalling & Telecommunications Department with corrigendum No. 1 Standard Specifications for Materials and Works Volume III - Signalling & Telecommunications Works |
| |
Oct 30 2005 RVNL Standard Specifications for Electrical Engineering Department with corrigendum No. 1 Standard Specifications for Materials and Works Volume II - General Electrification & Railway Electrification Works |
| |
Oct 29 2005 RVNL Standard Specifications for Civil Engineering Department with Corrigendum No. 1 Standard Specifications for Materials and Works Volume I for Engineering Works |
| |
Jan 31 2005 Social Resettlement & Rehabilitation Plan of Aligarh-Ghaziabad 3rd line 106.15 km UP The proposed 3rd railway line between Aligarh and Ghaziabad is in the state of Uttar Pradesh and passes through four districts viz. Gautam Budh Nagar, Ghaziabad, Bulandshahr and Aligarh. |
| |
Jan 31 2005 Social Resettlement & Rehabilitation Plan of Barang - Khurda Road 3rd line 35 km Orissa The proposed construction of third railway line along the existing double line section from Barang to Khurda-Road (34.945 km) of East Coast Railway has been posed by Rail Vikas Nigam Limited (RVNL) under Ministry of Railways for possible funding by the ADB. The project is situated in Cuttack and Khurda districts of Orissa. |
| |
Jan 28 2005 Social Resettlement & Rehabilitation Plan of Cuttack - Barang doubling 12.1 km Orissa The Cuttack -Barang single line section of East Coast Railway on Howrah- Chennai main line is situated in district Cuttack of Orissa. |
| |
Jan 28 2005 Social Resettlement & Rehabilitation Plan of Gooty - Pullampet Doubling - 151 Km AP The proposed doubling of the Pullampet- Gooty broad gauge line lies entirely in the State of Andhra Pradesh. Gooty - Renigunta is a single line non-electrified section of 280 kms. |
| |
Jan 28 2005 Social Resettlement & Rehabilitation Plan of Raichur-Guntakal doubling 81 km Karnataka Railway line between Raichur and Guntakal passes through two states – Andhra Pradesh and Karnataka Majority of the line is in Kurnool district of Andhra Pradesh. A small portion, starting from Raichur up to Tungabhadra river is in Raichur district of Karnataka, out of which Raichur-Matamari portion (17.03 KM) has already been doubled. Remaining portion from Matamari to Tungabhadra river is approximately 10 Km. Similarly a small portion (5 Km stretch) towards the other end of the section, after Nancherla up to Guntakal, falls in Anantapur district of AP. |
| |
Jan 28 2005 Social Resettlement & Rehabilitation Plan of Rajatgarh - Barang 20 km Orissa At present, Rajathgarh to Barang has single line 25 km in length. It is proposed to double this line to meet the increasing demand of traffic. Rajatgarh-Barang single line section is part of Talcher-Rajatgarh-Barang section (98 km) which joins Howrah-Madras East Coast main line at Barang. It is an important branch line, which was commissioned on 19.11.1966. The purpose of the construction of this line was to give connection to Talcher Coalfields with Howrah-Madras main line. |
| |
Nov 03 2004 Short Resettlement Plan for Bhatapara - Urkura 3rd Line Project in the State of Chattisgarh |
| |