STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 22.01.2017 TO 28.01.2017
 
Feb 02 2017

Notification of Award for "Execution of balance work of service buildings and platform and other works including general service electrical works etc in Binkadkatti-Gadag-Kanginhal Stations in connection with Hosapete-Tinaighat doubling project on Hubballi division of South Western Railway."
 
Jan 31 2017

Notification of Award for "Execution of Flash Butt welding and Alumino Thermit welding (SKV) of 60 Kg/52 Kg Rail Joints".
 
Jan 27 2017

Quotation for cutting of trees near Safdarjung Railway station.
 
Jan 25 2017

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 15.01.2017 TO 21.01.2017
 
Jan 24 2017

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 01.01.2017 TO 14.01.2017
 
Jan 10 2017

Notification of Award for "Execution of balance work of Earthwork, Blanketing and Track work etc., in Gadag-Kanginhal section in connection Hosapete-Tinaighat doubling project on Hubballi Division of South Western Railway."
 
Jan 05 2017

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 25.12.2016 TO 31.12.2016
 
Dec 30 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 11.12.2016 TO 24.12.2016
 
Dec 20 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 27.11.2016 TO 10.12.2016
 
Dec 02 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 13.11.2016 TO 26.11.2016
 
Nov 17 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 30.10.2016 TO 12.11.2016
 
Nov 07 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 23.10.2016 TO 29.10.2016
 
Oct 27 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 16.10.2016 TO 22.10.2016
 
Oct 26 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 09.10.2016 TO 15.10.2016
 
Oct 19 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 02.10.2016 TO 08.10.2016
 
Oct 13 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 25.09.2016 TO 01.10.2016
 
Oct 06 2016

Notification of Award for Construction of road bed, track linking (excluding supply of rails and sleepers, thick web switches and special sleepers) at road no. 1 & 2 and up gradation of PF no. 2 & 3 in port marshalling yard of new Mangalore port trust, Panambur, Mangalore Karnataka State, India
 
Oct 04 2016

Notification of Award for "Execution of balance works in Br. no. 166 (1*30.5m OWG), 171 (1*30.5m OWG) & 185 (4*18.3m PSC girders) in Naranpur (NANR)- Basantpur (BSTP) section in connection with doubling between Jaroli (incl.) (170.903km) on Khurda Road Division of East Coast Railway in the State of Odisha, India ".
 
Sep 30 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 28.08.2016 TO 03.09.2016
 
Sep 29 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 18.09.2016 TO 24.09.2016
 
Sep 23 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 11.09.2016 TO 17.09.2016
 
Sep 19 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 04.09.2016 TO 10.09.2016
 
Aug 31 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 21.08.2016 TO 27.08.2016
 
Aug 26 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 14.08.2016 TO 20.08.2016
 
Aug 23 2016

Notification of Award for "Construction of Roadbed, Major and Minor bridges and track linking (Excluding supply of Rails and Sleepers) & General Electrical works in connection with new bypass BG double line between Kusagal-Hubli at KM: 6/755 and Hubli-Amaragol at KM: 475/139 on Hubli division of South Western Railway in Dharwad District in Karnataka State, India".
 
Aug 19 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 07.08.2016 TO 13.08.2016
 
Aug 11 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 31.07.2016 TO 06.08.2016
 
Aug 03 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 24.07.2016 TO 30.07.2016
 
Jul 28 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 17.07.2016 TO 23.07.2016
 
Jul 21 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 10.07.2016 TO 16.07.2016
 
Jul 15 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 26.06.2016 to 09.07.2016
 
Jul 01 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 19.06.2016 TO 25.06.2016
 
Jun 24 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 12.06.2016 TO 18.06.2016
 
Jun 20 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 05.06.2016 TO 11.06.2016
 
Jun 08 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 29.05.2016 to 04.06.2016
 
Jun 02 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 22.5.2016 TO 28.5.2016
 
May 25 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 15.05.2016 TO 21.05.2016
 
May 19 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 08.05.2016 to 14.05.2016
 
May 11 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 01.05.2016 TO 07.05.2016
 
May 10 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 24.04.2016 to 30.04.2016
 
Apr 29 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 17.04.2016 to 23.04.2016
 
Apr 22 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 10.04.2016 TO 16.04.2016
 
Apr 18 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 03.04.2016 TO 09.04.2016
 
Apr 06 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 27.03.2016 TO 02.04.2016
 
Mar 30 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 20.03.2016 TO 26.03.2016
 
Mar 28 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 13.03.2016 to 19.03.2016
 
Mar 16 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 06.03.2016 TO 12.03.2016
 
Mar 10 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 28.02.2016 TO 05.03.2016
 
Mar 04 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 14.02.2016 TO 20.02.2016
 
Mar 04 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 21.02.2016 TO 27.02.2016
 
Feb 18 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 07.02.2016 TO 13.02.2016
 
Feb 11 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 31.01.2016 TO 06.02.2016
 
Feb 08 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 24.01.2016 TO 30.01.2016
 
Feb 03 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 17.01.2016 TO 23.01.2016
 
Jan 25 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 10.01.2016 TO 16.01.2016
 
Jan 13 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 03.01.2016 TO 09.01.2016
 
Jan 07 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 27.12.2015 TO 02.01.2016
 
Jan 07 2016

Letter of Award for Bankability and Financial Feasibility Study for Cumbum to ProddaturNew line in South Central Railway.
 
Jan 07 2016

Letter of Award for Bankability and Financial Feasibility Study for New Rail Connectivity to Karaikal Port in Southern Railway
 
Jan 07 2016

Letter of Award for Bankability and Financial Feasibility Study for Milavittan to Melamarudur New line in Southern Railway.
 
Jan 06 2016

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 20.12.2015 TO 26.12.2015
 
Dec 29 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 13.12.2015 TO 19.12.2015
 
Dec 29 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 06.12.2015 TO 12.12.2015
 
Dec 11 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 22.11.2015 TO 05.12.2015
 
Nov 30 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 01.11.2015 TO 14.11.2015
 
Nov 09 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 25.10.2015 TO 31.10.2015
 
Oct 19 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 04.10.2015 TO 10.10.2015
 
Oct 15 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 20.09.2015 TO 03.10.2015
 
Sep 28 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 13.09.2015 TO 19.09.2015
 
Sep 18 2015

Notification of Award for Package-2 Aunrihar-Allahabad (Excl.) Against the bid invited for
 
Sep 17 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 06.09.2015 TO 12.09.2015
 
Sep 08 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 30.08.2015 TO 05.09.2015
 
Sep 03 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 23.08.2015 TO 29.08.2015
 
Aug 26 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 16.08.2015 TO 22.08.2015
 
Aug 19 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 09.08.2015 TO 15.08.2015
 
Aug 13 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 02.08.2015 TO 08.08.2015
 
Aug 06 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 26.07.2015 TO 01.08.2015
 
Jul 31 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 19.07.2015 TO 25.07.2015
 
Jul 21 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 12.07.2015 TO 18.07.2015
 
Jul 15 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 05.07.2015 TO 11.07.2015
 
Jul 08 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 28.06.2015 TO 04.07.2015
 
Jul 01 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 21.06.2015 TO 27.06.2015
 
Jun 24 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 14.06.2015 TO 20.06.2015
 
Jun 17 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 07.06.2015 TO 13.06.2015
 
Jun 11 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 31.05.2015 TO 06.06.2015
 
Jun 03 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 24.05.2015 TO 30.05.2015
 
May 27 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 17.05.2015 TO 23.05.2015
 
May 19 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 10.05.2015 TO 16.05.2015
 
May 13 2015
STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 03.05.2015 TO 09.05.2015
 
May 08 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 26.04.2015 TO 02.05.2015
 
May 06 2015

Award of Bankability Study for New Rail Connectivity to Cement Plants from Sanjamala Railway Station Between Yerraguntla – Nandyal Section on Guntakal Division of South Central Railway
 
Apr 30 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 19.04.2015 TO 25.04.2015
 
Apr 23 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 05.04.2015 TO 18.04.2015
 
Apr 09 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 29.03.2015 TO 04.04.2015
 
Mar 31 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 22.03.2015 TO 28.03.2015
 
Mar 25 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 15.03.2015 TO 21.03.2015
 
Mar 17 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 08.03.2015 TO 14.03.2015
 
Mar 11 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 01.03.2015 TO 07.03.2015
 
Mar 05 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 22.02.2015 TO 28.02.2015
 
Feb 25 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 15.02.2015 TO 21.02.2015
 
Feb 20 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 08.02.2015 TO 14.02.2015
 
Feb 13 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 01.02.2015 TO 07.02.2015
 
Feb 05 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 25.01.2015 TO 31.01.2015
 
Jan 30 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 18.01.2015 TO 24.01.2015
 
Jan 21 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 11.01.2015 TO 17.01.2015
 
Jan 16 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 04.01.2015 TO 10.01.2015
 
Jan 08 2015

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 28.12.2014 TO 03.01.2015
 
Dec 31 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 21.12.2014 TO 27.12.2014
 
Dec 24 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 14.12.2014 TO 20.12.2014
 
Dec 17 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 07.12.2014 TO 13.12.2014
 
Dec 10 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 30.11.2014 TO 06.12.2014
 
Dec 03 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 23.11.2014 TO 29.11.2014
 
Nov 26 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 16.11.2014 TO 22.11.2014
 
Nov 18 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 09.11.2014 TO 15.11.2014
 
Nov 12 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 02.11.2014 TO 08.11.2014
 
Nov 05 2014
STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 26.10.2014 TO 01.11.2014
 
Oct 29 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 19.10.2014 TO 25.10.2014
 
Oct 24 2014
STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 12.10.2014 TO 18.10.2014
 
Oct 15 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 05.10.2014 TO 11.10.2014
 
Oct 09 2014
STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 28.09.2014 TO 04.10.2014
 
Oct 07 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 21.09.2014 TO 27.09.2014
 
Sep 24 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 14.09.2014 TO 20.09.2014
 
Sep 17 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 07.09.2014 TO 13.09.2014
 
Sep 10 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 31.08.2014 TO 06.09.2014
 
Sep 03 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 24.08.2014 TO 30.08.2014
 
Aug 26 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 19.08.2014 TO 23.08.2014
 
Aug 20 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 11.08.2014 TO 18.08.2014
 
Aug 13 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 04.08.2014 TO 10.08.2014
 
Aug 12 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 28.07.2014 TO 03.08.2014
 
Jul 30 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 21.07.2014 TO 27.07.2014
 
Jul 22 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 14.07.2014 TO 20.07.2014
 
Jul 17 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 07.07.2014 TO 13.07.2014
 
Jul 03 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 23.06.2014 TO 29.06.2014
 
Jun 25 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 15.06.2014 TO 22.06.2014
 
Jun 16 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 08.06.2014 TO 14.06.2014
 
Jun 12 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 02.06.2014 TO 07.06.2014
 
Jun 03 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 18.05.2014 TO 01.06.2014
 
May 15 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 04.05.2014 TO 10.05.2014
 
May 06 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 27.04.2014 TO 03.05.2014
 
Apr 29 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 20.04.2014 TO 26.04.2014
 
Apr 22 2014

STATUS OF BILLS OF CONTRACTORS PASSED DURING THE PERIOD FROM 13.04.2014 TO 19.04.2014
 
Dec 05 2012
RVNL's Standard Safety, Health and Environment (SHE) Manual for Metro Rail Projects
Click here to download.
 
Sep 20 2012
RVNL's RISK MANAGEMENT POLICY
 
Aug 29 2012
Details of Contracts Awarded by PIU Raipur
Click here to view.
 
May 30 2012
RVNL Standard BOQ with Amendment No. 1 and 2.
Click here to view.
 
May 29 2012
Details of Contracts Awarded by PIU Mumbai
Click here to view.
 
Nov 29 2011
RVNL CORPORATE SOCIAL RESPONSIBILITY POLICY (2012-2017)
Click here to view
 
Sep 30 2011
RVNL's 5 YEAR PLAN FOR RESEARCH & DEVELOPMENT (2011-2016)
 
Sep 30 2011
RVNL's 5 YEAR PLAN ON SUSTAINABILITY (2011-2016)
 
Sep 22 2011
WHISTLE BLOWER POLICY OF RAIL VIKAS NIGAM NIGAM LIMITED
 
Sep 19 2011
PERFORMANCE APPRAISAL REPORT - PROCEDURE AND GUIDELINES
Performance appraisal report of Chief Executives/Functional Directors/Executives Directors/General Managers of Central Public Sector enterprises - Procedure and Guidelines
 
May 19 2011
RESETTLEMENT PLAN FOR SAMBALPUR - TITLAGARGH SUBPROJECT
Click here to download
 
May 19 2011
RESETTLEMENT PLAN FOR RAIPUR-TITLAGARGH DOUBLING SUBPROJECT (ORISSA SECTION)
Click here to download
 
May 19 2011
RESETTLEMENT PLAN FOR RAIPUR-TITLAGARGH DOUBLING SUBPROJECT (CHHATTISGARGH SECTION)
Click here to download
 
May 19 2011
RESETTLEMENT PLAN FOR HOSPET - TINAI GHAT SUBPROJECT (KARNATAKA SECTION)
Click here to download
 
May 19 2011
RESETTLEMENT FRAMEWORK
Click here to download
 
May 19 2011
INDIGENOUS PEOPLES PLANNING FRAMEWORK
Click here to download
 
May 19 2011
ENVIRONMENTAL ASSESSMENT AND REVIEW FRAMEWORK
Click here to download document.
 
May 19 2011
INITIAL ENVIRONMENTAL EXAMINATION FOR SAMBALPUR-TITLAGARH DOUBLING SUBPROJECT
Click here to download
 
May 19 2011
RESETTLEMENT PLAN FOR DAUND-GULBARGA DOUBLE TRACKING SUBPROJECT: MAHARASHTRA SECTION
Click here to download document.
 
May 19 2011
INITIAL ENVIRONMENTAL EXAMINATION FOR RAIPUR-TITLAGARH DOUBLING SUBPROJECT
Click here to download
 
May 19 2011
RESETTLEMENT PLAN FOR DAUND-GULBARGA DOUBLE TRACKING SUBPROJECT (KARNATAKA SECTION)
Click here to download document.
 
May 19 2011
INITIAL ENVIRONMENTAL EXAMINATION FOR PUNE-GUNTAKAL ELECTRIFICATION AND DAUND–GAULBARGA DOUBLING SUBPROJECTS
Click here to download
 
May 19 2011
INITIAL ENVIRONMENTAL EXAMINATION FOR HOSPET-TINAI GHAT DOUBLING SUBPROJECT
lick here to download
 
Apr 21 2011
Guidelines on Corporate Social Responsibility for Central Public Sector Enterprises.
Click here to view.
 
Oct 26 2010
Publishing of RVNL Magazine
Click here to view.
 
Sep 01 2010
RVNL CORPORATE SOCIAL RESPONSIBILITY POLICY
 
Jul 22 2010
RVNL Safety, Health and Environment (SHE) Manual
Click here to download.
 
Jun 18 2010
Quotation for Hiring of independent Floor For transit accommodation for RVNL.
Click here to view.
 
Jun 02 2009
Empanelment of Doctors
Empanelment of Doctors in Corporate Office, RVNL
 
Mar 03 2009
Master Management Information System maintained by Department of Public Enterprises concerning PSUs.
Master Management Information System - Data for the period October to December 2008
 
Nov 20 2008
VIGILANCE BULLETIN
Vigilance Bulletin 2008
 
Apr 28 2008
Code of Business Conduct and Ethics for Board Members and Senior Management Personnel of RVNL.
Please download the file.
 
Mar 06 2007
NOTIFICATION OF AWARD FOR PROCUREMENT OF GOODS FUNDED BY ADB
Please download NOTIFICATION OF AWARD FOR PROCUREMENT OF GOODS.
 
Jul 07 2006
SHORT RESETTLEMENT PLAN FOR RAJATGARH-BARANG RAILWAY LINE DOUBLING
Short resettlement plan
 
Jul 06 2006
RESETTLEMENT PLAN CUTTACK - BARANG DOUBLING OF RAILWAY LINE PROJECT
CUTTACK - BARANG DOUBLING OF RAILWAY LINE PROJECT
 
Oct 30 2005
RVNL Standard Specifications for Signalling & Telecommunications Department with corrigendum No. 1
Standard Specifications for Materials and Works Volume III - Signalling & Telecommunications Works
 
Jan 31 2005
Social Resettlement & Rehabilitation Plan of Aligarh-Ghaziabad 3rd line 106.15 km UP
The proposed 3rd railway line between Aligarh and Ghaziabad is in the state of Uttar Pradesh and passes through four districts viz. Gautam Budh Nagar, Ghaziabad, Bulandshahr and Aligarh.
 
Jan 31 2005
Social Resettlement & Rehabilitation Plan of Barang - Khurda Road 3rd line 35 km Orissa
The proposed construction of third railway line along the existing double line section from Barang to Khurda-Road (34.945 km) of East Coast Railway has been posed by Rail Vikas Nigam Limited (RVNL) under Ministry of Railways for possible funding by the ADB. The project is situated in Cuttack and Khurda districts of Orissa.
 
Jan 28 2005
Social Resettlement & Rehabilitation Plan of Cuttack - Barang doubling 12.1 km Orissa
The Cuttack -Barang single line section of East Coast Railway on Howrah- Chennai main line is situated in district Cuttack of Orissa.
 
Jan 28 2005
Social Resettlement & Rehabilitation Plan of Gooty - Pullampet Doubling - 151 Km AP
The proposed doubling of the Pullampet- Gooty broad gauge line lies entirely in the State of Andhra Pradesh. Gooty - Renigunta is a single line non-electrified section of 280 kms.
 
Jan 28 2005
Social Resettlement & Rehabilitation Plan of Raichur-Guntakal doubling 81 km Karnataka
Railway line between Raichur and Guntakal passes through two states – Andhra Pradesh and Karnataka Majority of the line is in Kurnool district of Andhra Pradesh. A small portion, starting from Raichur up to Tungabhadra river is in Raichur district of Karnataka, out of which Raichur-Matamari portion (17.03 KM) has already been doubled. Remaining portion from Matamari to Tungabhadra river is approximately 10 Km. Similarly a small portion (5 Km stretch) towards the other end of the section, after Nancherla up to Guntakal, falls in Anantapur district of AP.
 
Jan 28 2005
Social Resettlement & Rehabilitation Plan of Rajatgarh - Barang 20 km Orissa
At present, Rajathgarh to Barang has single line 25 km in length. It is proposed to double this line to meet the increasing demand of traffic. Rajatgarh-Barang single line section is part of Talcher-Rajatgarh-Barang section (98 km) which joins Howrah-Madras East Coast main line at Barang. It is an important branch line, which was commissioned on 19.11.1966. The purpose of the construction of this line was to give connection to Talcher Coalfields with Howrah-Madras main line.
 
Nov 03 2004
Short Resettlement Plan for Bhatapara - Urkura 3rd Line Project in the State of Chattisgarh