Jan 18 2012
Tender ID: 20110067 - CONSTRUCTION OF 4-LANE CABLE STAYED ROAD OVER BRIDGE OVER BARDDHAMAN YARD IN LIEU OF EXISTING 2-LANE ROB BRIDGE NO.213 OF EASTERN RAILWAY IN THE STATE OF WEST BENGAL, INDIA. A&C-2 |
| |
Jan 11 2012
Tender ID: 20110068 - RFP of Bankability study for construction of 2nd line between Palanpur and Samakhyali (247.73 Km) in Western Railway. A&C-1 and Minutes of Prebid Meeting. |
| |
Jan 02 2012
Tender ID: 20110068 - RFP of Bankability study for construction of 2nd line between Palanpur and Samakhyali (247.73 Km) in Western Railway. Bid Document. |
| |
Dec 30 2011
Tender ID: 20110067 - CONSTRUCTION OF 4-LANE CABLE STAYED ROAD OVER BRIDGE OVER BARDDHAMAN YARD IN LIEU OF EXISTING 2-LANE ROB BRIDGE NO.213 OF EASTERN RAILWAY IN THE STATE OF WEST BENGAL, INDIA. A&C-1 and Minutes of Prebid Meeting. |
| |
Dec 22 2011
Tender ID: 20110061 - Design, Supply, Erection, Testing & commissioning of 25 KV AC 50 HZ single phase, Traction Overhead Equipment including provision of 2nd transformer bay at Nidiguntapalem TSS, Signaling works and other associated works in connection A&C-3. |
| |
Dec 22 2011
Tender ID: 20110060 - DESIGN AND CONSTRUCTION OF POWER SUPPLY & POWER DISTRIBUTION, TRACTION ELECTRIFICATION, 750 V D.C. THIRD RAIL AND SCADA SYSTEM IN CONNECTION WITH EXTENSION OF METRO RAILWAY LINE NOAPARA (EXCLUDING) – BARANAGAR- DAKSHINESWAR A&C-5. |
| |
Dec 21 2011
Tender ID: 20110062 - Construction of Important and Major Steel/PSC Girder Bridges, Composite Girder ROBs along with substructure, super structure and related protection works in connection with part of Sambalpur - Titlagarh doubling in Sambalpur Division A&C-3 and Minutes of Prebid Meeting. |
| |
Dec 20 2011
Tender ID: 20110061 - Design, Supply, Erection, Testing & commissioning of 25 KV AC 50 HZ single phase, Traction Overhead Equipment including provision of 2nd transformer bay at Nidiguntapalem TSS, Signaling works and other associated works in connection A&C-2 |
| |
Dec 16 2011
Tender ID: 20110066 - DETAILED DESIGN CONSULTANCY SERVICES for the proposed Bridge over River Hooghly in Nabadwip Ghat to Nabadwip Dham project of Eastern Railway in the State of West Bengal, India A&C-1 and Minutes of Pre-bid Meeting. |
| |
Dec 15 2011
Tender ID: 20110067 - CONSTRUCTION OF 4-LANE CABLE STAYED ROAD OVER BRIDGE OVER BARDDHAMAN YARD IN LIEU OF EXISTING 2-LANE ROB BRIDGE NO.213 OF EASTERN RAILWAY IN THE STATE OF WEST BENGAL, INDIA. Bid Document. |
| |
Dec 14 2011
Tender ID: 20110061 - Design, Supply, Erection, Testing & commissioning of 25 KV AC 50 HZ single phase, Traction Overhead Equipment including provision of 2nd transformer bay at Nidiguntapalem TSS, Signaling works and other associated works A&C-1 |
| |
Dec 14 2011
Tender ID: 20110062 - Construction of Important and Major Steel/PSC Girder Bridges, Composite Girder ROBs along with substructure, super structure and related protection works in connection with part of Sambalpur - Titlagarh doubling in Sambalpur Division A&C-2 |
| |
Dec 13 2011
Tender ID: 20110062 - Construction of Important and Major Steel/PSC Girder Bridges, Composite Girder ROBs along with substructure, super structure and related protection works in connection with part of Sambalpur - Titlagarh doubling in Sambalpur Division A&C-1 |
| |
Dec 09 2011
Tender ID: 20110060 - DESIGN AND CONSTRUCTION OF POWER SUPPLY & POWER DISTRIBUTION, TRACTION ELECTRIFICATION, 750 V D.C. THIRD RAIL AND SCADA SYSTEM IN CONNECTION WITH EXTENSION OF METRO RAILWAY LINE NOAPARA (EXCLUDING) – BARANAGAR- DAKSHINESWAR A&C-4 and Revised EQC |
| |
Dec 09 2011
Tender ID: 20110064 - Conducting Survey including preparation of detailed plans, detailed Estimate, Detailed Design Engineering of Railway Electrification & General Electrical works in connection with Double line section with existing Single line A&C-1 |
| |
Dec 09 2011
Tender ID: 20110065 - SINGLE STAGE TWO PACKET SYSTEM for two (02) contract packages as under: PACKAGE - JMS1: CONSTRUCTION OF JOKA, THAKURPUKUR, SAKHER BAZAR AND BEHALA CHOWRASTA STATIONS INCLUDING ALL RELATED WORKS (ARCHITECTURE, ELECTRICAL & MECHANICA Bid Document. |
| |
Dec 08 2011
Tender ID: 20110061 - Design, Supply, Erection, Testing & commissioning of 25 KV AC 50 HZ single phase, Traction Overhead Equipment including provision of 2nd transformer bay at Nidiguntapalem TSS, Signaling works and other associated works Clarification functional table. |
| |
Dec 02 2011
Tender ID: 20110065 - SINGLE STAGE TWO PACKET SYSTEM for two (02) contract packages as under: PACKAGE - JMS1: CONSTRUCTION OF JOKA, THAKURPUKUR, SAKHER BAZAR AND BEHALA CHOWRASTA STATIONS INCLUDING ALL RELATED WORKS (ARCHITECTURE, ELECTRICAL & MECHANICA IFB Document |
| |
Dec 02 2011
Tender ID: 20110066 - DETAILED DESIGN CONSULTANCY SERVICES for the proposed Bridge over River Hooghly in Nabadwip Ghat to Nabadwip Dham project of Eastern Railway in the State of West Bengal, India Bid Document. |
| |
Dec 01 2011
Tender ID: 20110064 - Conducting Survey including preparation of detailed plans, detailed Estimate, Detailed Design Engineering of Railway Electrification & General Electrical works in connection with Double line section with existing Single line in Rewar Bid Document. |
| |
Nov 25 2011
Tender ID: 20110063 - Construction of Multi Functional Complexes (MFCs) at Rae Bareli & Ayodhya, Railway Stations in Uttar Pradesh State.Approximate cost Rs.170 Lacs Bid Document |
| |
Nov 25 2011
Tender ID: 20110060 - DESIGN AND CONSTRUCTION OF POWER SUPPLY & POWER DISTRIBUTION, TRACTION ELECTRIFICATION, 750 V D.C. THIRD RAIL AND SCADA SYSTEM IN CONNECTION WITH EXTENSION OF METRO RAILWAY LINE NOAPARA (EXCLUDING) – BARANAGAR- DAKSHINESWAR A&C-3 and Minutes of Pre-bid Meeting |
| |
Nov 24 2011
Tender ID: 20110061 - Design, Supply, Erection, Testing & commissioning of 25 KV AC 50 HZ single phase, Traction Overhead Equipment including provision of 2nd transformer bay at Nidiguntapalem TSS, Signaling works and other associated works Minutes of Pre-bid Meeting. |
| |
Nov 14 2011
Tender ID : 20110045 - Execution of Railway Electrification of Pune-Bhigwan & Gulbarga- Wadi 378 TKM, Wadi-Raichur 260 TKM and Raichur- Guntakal 287 TKM section in Pune, Solapur & Guntakal Division of Central Railway and South Central Railway A&C-III and Clarification on queries of prospective bidders |
| |
Nov 09 2011
Tender ID: 20110059 - Detailed Design Consultancy Services for Power Supply & Power Distribution, 750V DC Third Rail Traction Electrification and SCADA System for Baranagar – Barrackpor, Dum Dum Airport – New Garia and Joka – BBD Bagh elevated and undergr A&C-1 and Minutes of Pre-bid Meeting. |
| |
Nov 08 2011
Tender ID: 20110061 - Design, Supply, Erection, Testing & commissioning of 25 KV AC 50 HZ single phase, Traction Overhead Equipment including provision of 2nd transformer bay at Nidiguntapalem TSS, Signaling works and other associated works in connection Bid Document. |
| |
Nov 08 2011
Tender ID: 20110062 - Construction of Important and Major Steel/PSC Girder Bridges, Composite Girder ROBs along with substructure, super structure and related protection works in connection with part of Sambalpur - Titlagarh doubling in Sambalpur Division Bid Document. |
| |
Nov 03 2011
Tender ID: 20110060 - DESIGN AND CONSTRUCTION OF POWER SUPPLY & POWER DISTRIBUTION, TRACTION ELECTRIFICATION, 750 V D.C. THIRD RAIL AND SCADA SYSTEM IN CONNECTION WITH EXTENSION OF METRO RAILWAY LINE NOAPARA (EXCLUDING) – BARANAGAR- DAKSHINESWAR OF KOLK A&C-2 |
| |
Nov 01 2011
Tender ID: 20110044 - Construction of Two Tunnels at Chainages 18660 to 19600 and 23370 to 29990 with ballastless track and construction of Roadbed from KM 17/0 to 35/0 including Earthwork in Formation, Major and Minor Bridges for New Broad Gauge Railway A&C-3 |
| |
Nov 01 2011
Tender ID: 20110053 - Detailed Design Consultancy Services for Vehicle Maintenance Depots Cum Workshops for Joka on Joka-BBD BAGH Corridor. A&C-2 and Minutes of Prebid Meeting. |
| |
Oct 20 2011
Tender ID: 20110058 - PROJECT MANAGEMENT CONSULTANCY SERVICES FOR CONSTRUCTION OF SHEDS, STRUCTURES, PORTA BLOCKS, WATER SUPPLY ARRANGEMENT, SEWERAGE, DRAINAGE, ROADS, TRACK, S&T, POWER SUPPLY ARRANGEMENT, GENRAL ELECTRICAL WORKS AND SUPPLY, ERECTION & CO A&C-1 and Minutes of Prebid Meeting. |
| |
Oct 20 2011
Tender ID: 20110057 - Detailed Design Consultancy Services for the following works: PACKAGE I : Detailed Design Consultancy Services For Eight Elevated Metro Stations from Kavi Subhash (Ch : Km -0.247) To Barun Sen Gupta (Ch : Km 8.550) Stations – Both A&C-3 |
| |
Oct 13 2011
Tender ID: 20110057 - Detailed Design Consultancy Services for the following works: PACKAGE I : Detailed Design Consultancy Services For Eight Elevated Metro Stations from Kavi Subhash (Ch : Km -0.247) To Barun Sen Gupta (Ch : Km 8.550) Stations A&C-1 and Minutes of Prebid Meeting. |
| |
Oct 13 2011
Tender ID: 20110053 - Detailed Design Consultancy Services for Vehicle Maintenance Depots Cum Workshops for Joka on Joka-BBD BAGH Corridor. A&C-1. |
| |
Oct 12 2011
Tender ID: 20110049 - Project Management Consultancy Services for Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, Traction Sub-stations, SCADA, General Electrical Services A&C-2 and Minutes of Prebid Meeting. |
| |
Oct 11 2011
Tender ID: 20110054 - I) RVNL/BBS/JRL�JKPR/PMC PACKAGE 1 - �CONSTRUCTION OF ROADBED, MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS, THICK WEB SWITCHES AND PSC LINE SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORKS IN CONNECTION WIT A&C-1 and Minutes of Prebid Meeting. |
| |
Oct 10 2011
Tender ID: 20110059 - Detailed Design Consultancy Services for Power Supply & Power Distribution, 750V DC Third Rail Traction Electrification and SCADA System for Baranagar – Barrackpor, Dum Dum Airport – New Garia and Joka – BBD Bagh elevated and undergr Bid Document. |
| |
Oct 10 2011
Tender ID: 20110058 - CONSTRUCTION OF SHEDS, STRUCTURES, PORTA BLOCKS, WATER SUPPLY ARRANGEMENT, SEWERAGE, DRAINAGE, ROADS, TRACK, S&T, POWER SUPPLY ARRANGEMENT, GENRAL ELECTRICAL WORKS AND SUPPLY, ERECTION & COMMISSIONING OF MACHINERY & PLANT IN CONNECTI Bid Document. |
| |
Oct 05 2011
Tender ID : 20110045 - Execution of Railway Electrification of Pune-Bhigwan & Gulbarga- Wadi 378 TKM, Wadi-Raichur 260 TKM and Raichur- Guntakal 287 TKM section in Pune, Solapur & Guntakal Division of Central Railway and South Central Railway in the Stat A&C-1 and Minutes of Prebid Meeting. |
| |
Oct 01 2011
Tender ID: 20110051 - Conducting Final Location Survey including preparation of detailed plans & sections and detailed Estimate, Marking Centre Line, Geotechnical Investigation and Detailed Design Engineering in connection with Doubling along with Electri A&C-1 and Minutes of Prebid Meeting. |
| |
Sep 30 2011
Tender ID: 20110044 - Construction of Two Tunnels at Chainages 18660 to 19600 and 23370 to 29990 with ballastless track and construction of Roadbed from KM 17/0 to 35/0 including Earthwork in Formation, Major and Minor Bridges for New Broad Gauge Railway A&C-1. |
| |
Sep 30 2011
Tender ID: 20110055 - DETAILED DESIGN CONSULTANCY SERVICES FOR TEN ELEVATED METRO STATIONS AND VIADUCT BETWEEN BARNAGAR (CH. 4571.00) TO BARRCKPUR (CH. 17200.00) IN BARANAGAR-BARRACKPUR CORRIDOR OF KOLKATA METRO RAILWAY LINE A&C-1 and Minutes of Prebid Meeting. |
| |
Sep 29 2011
Tender ID: 20110056 - EXTRA WIDENING OF B.T ROAD FROM BARANAGAR TO BARRACKPORE IN CONNECTION WITH THE METRO PROJECT BETWEEN BARANAGAR TO BARRACKPORE, WEST BENGAL, INDIA. A&C-1 and Minutes of Prebid Meeting. |
| |
Sep 20 2011
Tender ID: 20110048 - DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF 11KV/433 VOLT OUTDOOR SUB-STATIONS AT GUNTAKAL, KONDAPURAM AND NANDALUR STATIONS OF GUNTAKAL DIVISION OF SOUTH CENTRAL RAILWAY, INDIA A&C-1 |
| |
Sep 20 2011
Tender ID: 20110049 - Project Management Consultancy Services for Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, Traction Sub-stations, SCADA, General Electrical Services w A&c-1 |
| |
Sep 20 2011
Tender ID: 20110057 - Detailed Design Consultancy Services for the following works: PACKAGE I : Detailed Design Consultancy Services For Eight Elevated Metro Stations from Kavi Subhash (Ch : Km -0.247) To Barun Sen Gupta (Ch : Km 8.550) Stations – Both Bid Document. |
| |
Sep 17 2011
Tender ID: 20110056 - “EXTRA WIDENING OF B.T ROAD FROM BARANAGAR TO BARRACKPORE IN CONNECTION WITH THE METRO PROJECT BETWEEN BARANAGAR TO BARRACKPORE, WEST BENGAL, INDIA.” Bid Document |
| |
Sep 16 2011
Tender ID: 20110055 - DETAILED DESIGN CONSULTANCY SERVICES FOR TEN ELEVATED METRO STATIONS AND VIADUCT BETWEEN BARNAGAR (CH. 4571.00) TO BARRCKPUR (CH. 17200.00) IN BARANAGAR-BARRACKPUR CORRIDOR OF KOLKATA METRO RAILWAY LINE Bid Document. |
| |
Sep 16 2011
Tender ID: 20110048 - DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF 11KV/433 VOLT OUTDOOR SUB-STATIONS AT GUNTAKAL, KONDAPURAM AND NANDALUR STATIONS OF GUNTAKAL DIVISION OF SOUTH CENTRAL RAILWAY, INDIA Prebid Minutes. |
| |
Sep 15 2011
Tender ID: 20110046 - Manufacture and Supply of 10125 mm Over Riding Curved Switches 1 in 12, (BG) 60 Kg to RDSO drawing no. T-4219 conforming to Indian Railway Specifications IRS-T-10-2000 read along with its latest amendments for various rail road proje A&C-I and Minutes of Prebid Meeting. |
| |
Sep 15 2011
Tender ID: 20110054 - I) RVNL/BBS/JRL–JKPR/PMC PACKAGE 1 - “CONSTRUCTION OF ROADBED, MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS, THICK WEB SWITCHES AND PSC LINE SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORKS IN CONNECTION WITH DOUBLING BET Bid Document. |
| |
Sep 14 2011
Tender ID: 20110053 - Detailed Design Consultancy Services for Vehicle Maintenance Depots Cum Workshops for Joka on Joka-BBD BAGH Corridor. Bid Document. |
| |
Sep 12 2011
20110052 - Hiring of Vehicles for Officials of RVNL Bid Document. |
| |
Sep 12 2011
20110051 - Conducting Final Location Survey including preparation of detailed plans & sections and detailed Estimate, Marking Centre Line, Geotechnical Investigation and Detailed Design Engineering in connection with Doubling along with Electrification (R Bid Document. |
| |
Sep 08 2011
Tender ID: 20110050 - “Construction of Multi Functional Complexes (MFCs)/Buildings at Rae Bareli & Ayodhya, Railway Stations in Uttar Pradesh State” Approximate cost Rs.170 Lacs Bid Document. |
| |
Sep 08 2011
Tender ID - 20110047 - “Conducting Final Location Survey which includes preparation of Detailed Plans & Section, Yard Plans, GADs etc., Staking Centre Line, Geotechnical Investigations, Detailed Design of Minor and Major Bridges, Survey of Electrical work Minutes of Prebid Meeting. |
| |
Sep 07 2011
Tender ID: 20110049 - Project Management Consultancy Services for Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, Traction Sub-stations, SCADA, General Electrical Services w Bid Document. |
| |
Sep 02 2011
Tender ID: 20110043 - “DETAILED DESIGN CONSULTANCY SERVICES FOR APPROX. 17.0 KM LENGTH OF VIADUCT PORTION ALONG WITH SIDING IN BETWEEN & RELATED WORKS AND APPROACH SPANS OF THE STATIONS BUT EXCLUDING STATION AREAS FROM SCINCE CITY to VIP ROAD (UPTO SWITC A&C-I and Minutes of Prebid Meeting. |
| |
Sep 02 2011
Tender ID: 20110048 - DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF 11KV/433 VOLT OUTDOOR SUB-STATIONS AT GUNTAKAL, KONDAPURAM AND NANDALUR STATIONS OF GUNTAKAL DIVISION OF SOUTH CENTRAL RAILWAY, INDIA Bid Document. |
| |
Sep 02 2011
Tender ID: 20110036 - “Soil Investigation and Detailed Design Engineering for Proposed Doubling of Rani (excl.) – Keshavganj (excl.) (59.50 km) Section on Ajmer Division of North Western Railway.” Approx Cost: - Rs 72.00 Lacs A&C-2 |
| |
Sep 01 2011
Tender ID: 20110040 - IFB No. RVNL/CO/SRPJ-ABR/5 dated: 26.07.2011: Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding supply of Rails and Sleepers) S&T and General Electrical Work ICW Doubling between Swarupganj –Abu Road (26. A&C-II and Minutes of Prebid Meeting. |
| |
Aug 29 2011
Tender ID: 20110047 - Conducting Final Location Survey which includes preparation of Detailed Plans & Section, Yard Plans, GADs etc., Staking Centre Line, Geotechnical Investigations, Detailed Design of Minor and Major Bridges, Survey of Electrical works Bid Document. |
| |
Aug 29 2011
Tender ID : 20110033 - Execution of Doubling of track between Villupuram and Dindigul, in two contract packages as under: I) Package- 1 - Construction of Roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & PSC sleepers) A&C-3 |
| |
Aug 29 2011
Tender ID : 20110041 - Conducting Final Location Survey which includes preparation of Detailed Plans & Section, Yard Plans, GADs etc., Staking Centre Line, Geotechnical Investigations, Detailed Design of Minor and Major Bridges, survey of Electrical works Minutes of Pre-bid Meeting. |
| |
Aug 29 2011
Tender ID: 20110046 - Manufacture and Supply of 10125 mm Over Riding Curved Switches 1 in 12, (BG) 60 Kg to RDSO drawing no. T-4219 conforming to Indian Railway Specifications IRS-T-10-2000 read along with its latest amendments for various rail road proje Bid Document. |
| |
Aug 25 2011
Tender ID : 20110045 - Execution of Railway Electrification of Pune-Bhigwan & Gulbarga- Wadi 378 TKM, Wadi-Raichur 260 TKM and Raichur- Guntakal 287 TKM section in Pune, Solapur & Guntakal Division of Central Railway and South Central Railway in the Stat Bid Document. |
| |
Aug 23 2011
Tender ID : 20110036 - “Soil Investigation and Detailed Design Engineering for Proposed Doubling of Rani (excl.) – Keshavganj (excl.) (59.50 km) Section on Ajmer Division of North Western Railway.” Approx Cost: - Rs 72.00 Lacs A&C-I |
| |
Aug 23 2011
Tender ID: 20110044 - Construction of Two Tunnels at Chainages 18660 to 19600 and 23370 to 29990 with ballastless track and construction of Roadbed from KM 17/0 to 35/0 including Earthwork in Formation, Major and Minor Bridges for New Broad Gauge Railway Bid Document. |
| |
Aug 19 2011
Tender ID: 20110043 - “DETAILED DESIGN CONSULTANCY SERVICES FOR APPROX. 17.0 KM LENGTH OF VIADUCT PORTION ALONG WITH SIDING IN BETWEEN & RELATED WORKS AND APPROACH SPANS OF THE STATIONS BUT EXCLUDING STATION AREAS FROM SCINCE CITY to VIP ROAD (UPTO SWITC Bid Document. |
| |
Aug 18 2011
Tender ID : 20110031 - IFB NO: RVNL/ABR-PNU/CO/4 dated 20-06-2011. Project Management Consultancy Services for Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding supply of Rails and Sleepers, Thick Web Switches) S&T and general Pre-bid Meeting Minutes. |
| |
Aug 17 2011
Tender ID : 20110041 - “Conducting Final Location Survey which includes preparation of Detailed Plans & Section, Yard Plans, GADs etc., Staking Centre Line, Geotechnical Investigations, Detailed Design of Minor and Major Bridges, survey of Electrical work Bid Document. |
| |
Aug 12 2011
Tender ID: 20110029 - Conducting Final Location Survey including preparation of detailed plans & sections and detailed Estimate, Marking Centre Line, Geotechnical Investigations and Detailed Design Engineering in connection with Doubling of Rewari-Manheru A&C-IV and Minutes of Pre-bid Meeting. |
| |
Aug 11 2011
Tender ID: 20110029 - Conducting Final Location Survey including preparation of detailed plans & sections and detailed Estimate, Marking Centre Line, Geotechnical Investigations and Detailed Design Engineering in connection with Doubling of Rewari-Manheru A&C-III and Minutes of Pre-bid Meeting. |
| |
Aug 11 2011
Tender ID: 20110042 - PROJECT MANAGEMENT CONSULTANCY FOR “Construction of Roadbed, minor bridges, supply of ballast, Installation of track (excluding supply of rails & PSC sleepers), Electrical (Railway Electrification and General Electrification), outdo Bid Document. |
| |
Aug 10 2011
Tender ID: 20110024 - Bid Notification No. RVNL/Bangalore/Hospet-Tinaighat/ 2011/02 Dt 03/06/2011 - EXECUTION OF DOUBLING OF HOSPET-TINAIGHAT SECTION IN HUBLI DIVISION OF SOUTH WESTERN RAILWAY IN THE STATE OF KARNATAKA, INDIA IN 3 (THREE) PACAKAGES A&C-IV |
| |
Aug 10 2011
Tender ID; 20110040 - IFB No. RVNL/CO/SRPJ-ABR/5 dated: 26.07.2011. Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding supply of Rails and Sleepers) S&T and General Electrical Work ICW Doubling between Swarupganj –Abu Road A&C-I |
| |
Aug 09 2011
Tender ID: 20110029 - “Conducting Final Location Survey including preparation of detailed plans & sections and detailed Estimate, Marking Centre Line, Geotechnical Investigations and Detailed Design Engineering in connection with Doubling of Rewari-Manher A&C-II |
| |
Aug 08 2011
Tender ID : 20110041 - Bid Notice No : RVNL/HQ/2011/UT-RBL/FLS/1, Date : 08/08/2011 “Conducting Final Location Survey which includes preparation of Detailed Plans & Section, Yard Plans, GADs etc., Staking Centre Line, Geotechnical Investigations and Detai Notice Inviting Tender |
| |
Aug 06 2011
Tender ID: 20110024 - Bid Notification No. RVNL/Bangalore/Hospet-Tinaighat/ 2011/02 Dt 13/06/2011 EXECUTION OF DOUBLING OF HOSPET-TINAIGHAT SECTION IN HUBLI DIVISION OF SOUTH WESTERN RAILWAY IN THE STATE OF KARNATAKA, INDIA IN 3 (THREE) PACAKAGES Clarifications to Queries. |
| |
Aug 05 2011
Tener ID: 20110033 - Execution of Doubling of track between Villupuram and Dindigul, in two contract packages as under: I) Package- 1 - “Construction of Roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & PSC sleepers) A&c-II and Prebid Meeting Minutes. |
| |
Aug 02 2011
Tener ID: 20110033 - Execution of Doubling of track between Villupuram and Dindigul, in two contract packages as under: I) Package- 1 - “Construction of Roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & PSC sleepers), A&C-I |
| |
Aug 02 2011
Tender ID: 20110031 - IFB NO: RVNL/ABR-PNU/CO/4 dated 20-06-2011. Project Management Consultancy Services for Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding supply of Rails and Sleepers, Thick Web Switches) S&T and general E A&C-IV |
| |
Aug 01 2011
Tender ID: 20110030 - CONSTRUCTION OF MAJOR BRIDGES( PSC and STEEL GIRDER BRIDGES) IN CONNECTION WITH DOUBLING BETWEEN JAROLI (INCL) AND JAKHAPURA (INCL) (170.903 KM ON KHURDA ROAD DIVISION OF EAST COAST RAILWAY AND CHAKRADHARPUR DIVISION OF SOUTH EASTERN A&C-I and Prebid Meeting Minutes. |
| |
Jul 29 2011
Tender ID: 20110034 - CONSTRUCTION OF VIADUCT FOR METRO LINE BETWEEN KAVI SUBHASH (NEW GARIA) – RABINDRA TIRTHA IN FOUR CONTRACT PACKAGES A&C-I and Prebid Meeting Minutes. |
| |
Jul 29 2011
Tender ID: 20110024 - Bid Notificat ion No. RVNL/Bangalore/Hospet-Tinaighat/ 2011/02 Dt 03/06/2011 EXECUTION OF DOUBLING OF HOSPET-TINAIGHAT SECTION IN HUBLI DIVISION OF SOUTH WESTERN RAILWAY IN THE STATE OF KARNATAKA, INDIA IN 3 (THREE) PACAKAGES A&C-III |
| |
Jul 29 2011
Tender ID: 20110031 - IFB NO: RVNL/ABR-PNU/CO/4 dated 20-06-2011. Project Management Consultancy Services for Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding supply of Rails and Sleepers, Thick Web Switches) S&T and general E A&C-III |
| |
Jul 28 2011
Tender ID: 20110040 - IFB No. RVNL/CO/SRPJ-ABR/5 dated: 26.07.2011. Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding supply of Rails and Sleepers) S&T and General Electrical Work ICW Doubling between Swarupganj –Abu Road (26. Bid Document. |
| |
Jul 26 2011
Tender ID: 20110024 - Bid Notification No. RVNL/Bangalore/Hospet-Tinaighat/ 2011/02 Dt 03/06/2011 - EXECUTION OF DOUBLING OF HOSPET-TINAIGHAT SECTION IN HUBLI DIVISION OF SOUTH WESTERN RAILWAY IN THE STATE OF KARNATAKA, INDIA IN 3 (THREE) PACAKAGES A&C-II |
| |
Jul 26 2011
Tender ID: 20110035 - Design and Construction of 80 Units Multi Storey (B+S+10) Type-V Flats for Railway Officers and allied Works near Safadarjung Railway Station in Chankyapuri Area , New Delhi. A&C-II and Pre-bid Meeting Minutes. |
| |
Jul 25 2011
Tender ID: 20110039 - RFP : RVNL/Raipur/Raipur-Titlagarh/PMC/2011/02 Dtd: 25/07/2011 Project Management Consultancy for “Execution of doubling of Raipur - Titlagarh section in Raipur and Sambalpur Divisions of South East Central and East Coast Railways Bid Document. |
| |
Jul 25 2011
Tender ID: 20110038 - PROVISION OF MAINTENANCE FREE EARTH AS PER RDSO SPEC.NO RDSO/SPN/197/2008 AT 23 STATIONS IN GY-PMT SECTION OF GTL DIVISION OF SC RAILWAY IN CONNECTION WITH PATCH DOUBLING WORK OF GOOTY- PULLAMPET PROJECT ON GUNTAKAL DIVISION OF SOU Bid Document. |
| |
Jul 20 2011
Tender ID: 20110026 - Execution of Doubling of Raipur - Titlagarh Section in Sambalpur & Raipur Divisions of East Cost and South East Central Railways in the States of ODISHA & CHATTISGARH, India in 3 packages. A&C-I and Minutes of Prebid Meeting. |
| |
Jul 20 2011
Tender ID: 20110034 - CONSTRUCTION OF VIADUCT FOR METRO LINE BETWEEN KAVI SUBHASH (NEW GARIA) � RABINDRA TIRTHA IN FOUR CONTRACT PACKAGES Site Visit Notification. |
| |
Jul 19 2011
Tender ID: 20110028 - Bid Notification No. RVNL/Bangalore/Hospet-Tinaighat/ 2011/03 Dt 13/06/2011 - PROJECT MANAGEMENT CONSULTANCY FOR TINAIGHAT DOUBLING PROJECT IN 3 (THREE) PACKAGES A&C-I and Minutes of Pre-bid Meeting. |
| |
Jul 19 2011
Tender ID: 20110023 - Execution of Doubling of Daund- Gulbarga Section in Solapur Division of Central Railway in the State of Maharashtra, India in 2 (Two) packages. A&C-III |
| |
Jul 19 2011
Tender ID: 20110032 - EXTRA WIDENING OF B.T ROAD FROM BARANAGAR TO BARRACKPORE IN CONNECTION WITH THE METRO PROJECT BETWEEN BARANAGAR TO BARRACKPORE, WEST BENGAL, INDIA. A&C-I and Minutes of Pre-bid Meeting. |
| |
Jul 15 2011
Tender ID: 20110037 - RFP to appoint an NGO/Agency for implementation of Resettlement Plan (RP) for project affected persons of Daund - Gulbarga & Hospet - Tinaighat Doubling projects on Central Railway and South Western Railway in the states of Maharash Bid Document |
| |
Jul 14 2011
Tender ID : 20110029 - “Conducting Final Location Survey including preparation of detailed plans & sections and detailed Estimate, Marking Centre Line, Geotechnical Investigations and Detailed Design Engineering in connection with Doubling of Rewari-Manhe A&C-1. |
| |
Jul 12 2011
Tender ID: 20110036 - “Soil Investigation and Detailed Design Engineering for Proposed Doubling of Rani (excl.) – Keshavganj (excl.) (59.50 km) Section on Ajmer Division of North Western Railway.” Approx Cost: - Rs 72.00 Lacs Bid Document. |
| |
Jul 12 2011
INTERVIEW FOR METRO PROFESSIONALS to be held on 30.07.2011.... INTERVIEW FOR METRO PROFESSIONALS for the post of GM. AGM, JGM, Dy.GM, Sr.Manager, Manager, Asst. Manager to be held on 30.07.2011 For Project Office at RVNL/Kolkata. |
| |
Jul 11 2011
Tender ID: 20110035 - Design and Construction of 80 Units Multi Storey (B+S+10) Type-V Flats for Railway Officers and allied Works near Safadarjung Railway Station in Chankyapuri Area , New Delhi. A&C-1 |
| |
Jul 07 2011
Tender ID: 20110031 - Project Management Consultancy Services for Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding supply of Rails and Sleepers, Thick Web Switches) S&T and general Electrical Work ICW Doubling between Abu Road A&C-2 |
| |
Jul 05 2011
Tender ID: 20110035 - “Design and Construction of 80 Units Multi Storey (B+S+10) Type-V Flats for Railway Officers and allied Works near Safadarjung Railway Station in Chankyapuri Area , New Delhi” Bid Document. |
| |
Jul 02 2011
Status of Bills of Contractors Passed during the period from 16-6-2011 to 30-6-2011. Status of Bills of Contractors Passed during the period from 16-6-2011 to 30-6-2011. |
| |
Jul 02 2011
Status of Bills of Contractors Passed during the period from 01-6-2011 to 15-6-2011. Status of Bills of Contractors Passed during the period from 01-6-2011 to 15-6-2011. |
| |
Jul 01 2011
Status of Bills of Contractors Passed during the period from 14-5-2011 to 31-5-2011 Status of Bills of Contractors Passed during the period from 14-5-2011 to 31-5-2011
|
| |
Jul 01 2011
Tender ID: 20110023 - Execution of Doubling of Daund- Gulbarga Section in Solapur Division of Central Railway in the State of Maharashtra, India in 2 (Two) packages. Download A&C-2 and Minutes of Pre-bid Meeting. |
| |
Jun 30 2011
Tender ID: 20110025 - PROJECT MANAGEMENT CONSULTANCY FOR EXECUTION OF DOUBLING OF DAUND- GULBARGA SECTION IN SOLAPUR DIVISION OF CENTRAL RAILWAY IN THE STATE OF MAHARASHTRA and KARNATAKA, INDIA IN 2 PACKAGES. A&C-1 and Pre-bid Meeting Minutes. |
| |
Jun 28 2011
Tender ID: 20110017 - PROJECT MANAGEMENT CONSULTANCY SERVICES FOR CONSTRUCTION OF ROADBED, MAJOR & MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND LINE PSC SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORK IN CONNECTION WITH DOUBLING BETWEEN TA A&C-3 |
| |
Jun 27 2011
Tender ID: 20110033 - Execution of Doubling of track between Villupuram and Dindigul, in two contract packages Bid Document. |
| |
Jun 27 2011
Tender ID: 20110034 - CONSTRUCTION OF VIADUCT FOR METRO LINE BETWEEN KAVI SUBHASH (NEW GARIA) – RABINDRA TIRTHA IN FOUR CONTRACT PACKAGES Bid Document. |
| |
Jun 27 2011
Tender ID: 20110018 - CONSTRUCTION OF VIADUCT FOR METRO LINE BETWEEN KAVI SUBASH (NEWGARIA) - GOUR KISHORE GHOSH (CHINGRIGHATA) IN TWO CONTRACT PACKAGES AS UNDER: PACKAGE-I: “CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 4.6 KM LENGTH EXCLUDING STAT A&C-3 |
| |
Jun 22 2011
Tender ID: 20110016 - DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF DYNAMIC CAPACITOR BANK(DRPC) AND RELATED WORKS IN THE TRACTION-SUB-STATION AT BALICHAK IN KHARAGPUR DIVISION OF SOUTH EASTERN RAILWAY IN THE STATE OF WEST BENGAL. A&C-I and Minutes of Prebid Meeting. |
| |
Jun 22 2011
Tender ID: 20110032 - “EXTRA WIDENING OF B.T ROAD FROM BARANAGAR TO BARRACKPORE IN CONNECTION WITH THE METRO PROJECT BETWEEN BARANAGAR TO BARRACKPORE, WEST BENGAL, INDIA.” Bid Document. |
| |
Jun 22 2011
Tender ID: 20110031 - Project Management Consultancy Services for Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding supply of Rails and Sleepers, Thick Web Switches) S&T and general Electrical Work ICW Doubling between Abu Road Bid Document. |
| |
Jun 21 2011
Tender ID: 20110030 - “CONSTRUCTION OF MAJOR BRIDGES( PSC and STEEL GIRDER BRIDGES) IN CONNECTION WITH DOUBLING BETWEEN JAROLI (INCL) AND JAKHAPURA (INCL) (170.903 KM ON KHURDA ROAD DIVISION OF EAST COAST RAILWAY AND CHAKRADHARPUR DIVISION OF SOUTH EASTER Bid Document. |
| |
Jun 20 2011
Tender ID: 20110014 - Package-I: CONSTRUCTION OF ROADBED, MAJOR AND MINOR BRIDGES AND TRACK LINKING (EXCLUDING SUPPLY OF RAILS, SLEEPERS AND THICK WEBS WITCHES) S&T AND GENERAL ELECTRICAL WORK IN ABU ROAD - SAROTRA ROAD (24.35 Kms) IN AJMER DIVISION OF NO A&C-2 |
| |
Jun 17 2011
Tender ID: 20110020 - RFP to appoint an NGO/Agency for implementation of Resettlement Plan (RP) for project affected persons of Raipur Titlagarh Doubling & Titlagarh Sambalpur Doubling projects on South East Central Railway and East Coast Railway in the s A&C-2 and Minutes of Prebid Meeting. |
| |
Jun 15 2011
Tender ID : 20110029 - “Conducting Final Location Survey including preparation of detailed plans & sections and detailed Estimate, Marking Centre Line, Geotechnical Investigations and Detailed Design Engineering in connection with Doubling of Rewari-Manhe Bid Document. |
| |
Jun 13 2011
Tender ID: 20110028 - Bid Notification No. RVNL/Bangalore/Hospet-Tinaighat/ 2011/03 Dt 13/06/2011 - PROJECT MANAGEMENT CONSULTANCY FOR TINAIGHAT DOUBLING PROJECT IN 3 (THREE) PACKAGES Bid Document. |
| |
Jun 13 2011
Tender ID: 20110024 - Bid Notification No. RVNL/Bangalore/Hospet-Tinaighat/ 2011/02 Dt 03/06/2011 - EXECUTION OF DOUBLING OF HOSPET-TINAIGHAT SECTION IN HUBLI DIVISION OF SOUTH WESTERN RAILWAY IN THE STATE OF KARNATAKA, INDIA IN 3 (THREE) PACAKAGES A&C-1 |
| |
Jun 13 2011
Tender ID: 20110017 - “PROJECT MANAGEMENT CONSULTANCY SERVICES FOR CONSTRUCTION OF ROADBED, MAJOR & MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND LINE PSC SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORK IN CONNECTION WITH DOUBLING BETWEEN A&C-2 and Minutes of Prebid Meeting. |
| |
Jun 10 2011
Tender ID: 20110027 - NIT NO. RVNL/GC/ADB-II/EOI/2011 Dated 10.06.2011 Expression of Interest for Short listing of General Consultants for Railway Sector Investment Program: Doubling and Electrification of Railway tracks on critical routes.
Bid Document. |
| |
Jun 09 2011
Tender ID: 20110023 - Execution of Doubling of Daund- Gulbarga Section in Solapur Division of Central Railway in the State of Maharashtra, India in 2 (Two) packages. A&C-1 |
| |
Jun 08 2011
Tender ID: 20110026 - Invitation for Bids No.: RVNL/Raipur/Raipur-Titlagarh/2011/01 dated:06.06.2011 Bid Document. |
| |
Jun 08 2011
Tender ID: 20110018 - CONSTRUCTION OF VIADUCT FOR METRO LINE BETWEEN KAVI SUBASH (NEWGARIA) - GOUR KISHORE GHOSH (CHINGRIGHATA) IN TWO CONTRACT PACKAGES AS UNDER: PACKAGE-I: “CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 4.6 KM LENGTH EXCLUDING ST A&C-1 and Pre-bid Meeting Minutes. |
| |
Jun 07 2011
Tender ID: 20110022 - Annual Maintenance Contract OF Computers, Printers, UPSs, other Peripherals and Networking System at Corporate Office of RVNL, New Delhi. A&C-2 |
| |
Jun 03 2011
Tender ID; 20110025 - PROJECT MANAGEMENT CONSULTANCY FOR EXECUTION OF DOUBLING OF DAUND- GULBARGA SECTION IN SOLAPUR DIVISION OF CENTRAL RAILWAY IN THE STATE OF MAHARASHTRA and KARNATAKA, INDIA IN 2 PACKAGES. Bid Document. |
| |
Jun 03 2011
Tender ID: 20110024 - Bid Notification No. RVNL/Bangalore/Hospet-Tinaighat/ 2011/02 Dt 03/06/2011 Bid Document. |
| |
Jun 02 2011
Tender ID: 20110019 - PMC for Balance works of Construction of Road bed, Major and Minor Bridges and installation of track (excluding supply of rails, thick web switches and weldable CMS crossings ), Signaling and Electrical (Railway electrification an A&C-3 |
| |
Jun 02 2011
Tender ID: 20110014 - Open Tender : Package-I: CONSTRUCTION OF ROADBED, MAJOR AND MINOR BRIDGES AND TRACK LINKING (EXCLUDING SUPPLY OF RAILS, SLEEPERS AND THICK WEBS WITCHES) S&T AND GENRAL ELECTRICAL WORK IN ABU ROAD - SAROTRA ROAD (24.35 Kms) IN AJMER A&C-1 |
| |
Jun 01 2011
Tender ID: 20110020 - RFP to appoint an NGO/Agency for implementation of Resettlement Plan (RP) for project affected persons of Raipur – Titlagarh Doubling & Titlagarh – Sambalpur Doubling projects on South East Central Railway and East Coast Railway A&C-1 |
| |
May 31 2011
Tender ID: 20110019 - “PMC for Balance works of Construction of Road bed, Major and Minor Bridges and installation of track (excluding supply of rails, thick web switches and weldable CMS crossings ), Signaling and Electrical (Railway electrification an A&C-2 and Minutes of Prebid Meeting. |
| |
May 30 2011
Tender ID: 20110023 - Execution of Doubling of Daund- Gulbarga Section in Solapur Division of Central Railway in the State of Maharashtra, India in 2 (Two) packages. Bid Document. |
| |
May 30 2011
Tender ID: 20110018 - CONSTRUCTION OF VIADUCT FOR METRO LINE BETWEEN KAVI SUBASH (NEWGARIA) - GOUR KISHORE GHOSH (CHINGRIGHATA) IN TWO CONTRACT PACKAGES AS UNDER: PACKAGE-I: “CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 4.6 KM LENGTH EXCLUDING ST Site Visit Notice. |
| |
May 30 2011
Tender ID: 20110017 - “PROJECT MANAGEMENT CONSULTANCY SERVICES FOR CONSTRUCTION OF ROADBED, MAJOR & MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND LINE PSC SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORK IN CONNECTION WITH DOUBLING BETWEEN A&C-1 |
| |
May 28 2011
Tender ID: 20110011 - Construction of roadbed, major and minor bridges, civil works and track linking (excluding supply of rails and sleepers), general electrical work and S&T works in connection with doubling between Bhagat ki Kothi - Luni (28.4 km) on J A&C-V |
| |
May 27 2011
Tender ID: 20110022 - Annual Maintenance Contract OF Computers, Printers, UPSs, other Peripherals and Networking System at Corporate Office of RVNL, New Delhi. A&C-1 |
| |
May 26 2011
Tender ID: 20110019 - “PMC for Balance works of Construction of Road bed, Major and Minor Bridges and installation of track (excluding supply of rails, thick web switches and weldable CMS crossings ), Signaling and Electrical (Railway electrification an A&C-1 |
| |
May 26 2011
Tender ID: 20110022 - Annual Maintenance Contract OF Computers, Printers, UPSs, other Peripherals and Networking System at Corporate Office of RVNL, New Delhi Bid Document. |
| |
May 26 2011
Tender ID: 20110021 - Project Management Consultancy Services “BALANCE WORK FOR CONSTRUCTION OF ROADBED, MAJOR AND MINOR BRIDGES AND TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND SLEEPERS,THICK WEBS SWITCHES AND SPECIAL SLEEPERS) S&T AND OHE & GENERAL EL Bid Document. |
| |
May 24 2011
Tender ID: 20110011 - Construction of roadbed, major and minor bridges, civil works and track linking (excluding supply of rails and sleepers), general electrical work and S&T works in connection with doubling between Bhagat ki Kothi - Luni (28.4 km) A&C-4 |
| |
May 23 2011
Tender ID: 20110015 - CONSTRUCTION OF SHEDS, STRUCTURES, PORTA BLOCKS, WATER SUPPLY ARRANGEMENT, SEWERAGE, DRAINAGE, ROADS, TRACK, S&T, POWER SUPPLY ARRANGEMENT, GENRAL ELECTRICAL WORKS AND SUPPLY, ERECTION & COMMISSIONING OF MACHINERY & PLANT Pre-bid Minutes & Soil Investigation Report. |
| |
May 19 2011
Tender ID: 20110020 - RFP to appoint an NGO/Agency for implementation of Resettlement Plan (RP) for project affected persons of Raipur – Titlagarh Doubling & Titlagarh – Sambalpur Doubling projects on South East Central Railway and East Coast Railway Bid Document. |
| |
May 19 2011
Tender ID: 20110019 - “PMC for Balance works of Construction of Road bed, Major and Minor Bridges and installation of track (excluding supply of rails, thick web switches and weldable CMS crossings ), Signaling and Electrical (Railway electrification an Bid Document. |
| |
May 18 2011
Tender ID: 20110018 - CONSTRUCTION OF VIADUCT FOR METRO LINE BETWEEN KAVI SUBASH (NEWGARIA) - GOUR KISHORE GHOSH (CHINGRIGHATA) IN TWO CONTRACT PACKAGES AS UNDER: PACKAGE-I: “CONSTRUCTION OF VIADUCT INCLUDING RELATED WORKS FOR 4.6 KM LENGTH EXCLUDING Bid Document. |
| |
May 16 2011
Tender ID: 20110013 - Proposed new BG line between Obulavaripalle and NETHAVARIPALLE – Br. No. 11 on GUNJANA RIVER – PROVISION OF PILE FOUNDATION AND PILE CAP FOR A CLEAR SPAN OF 14 X 17.45 M. IN KADAPPA DISTRICT IN SOUTH CENTRAL RAILWAY A&C-1 and Minutes of Prebid Meeting. |
| |
May 16 2011
Tender ID: 20110011 - Construction of roadbed, major and minor bridges, civil works and track linking (excluding supply of rails and sleepers), general electrical work and S&T works in connection with doubling between Bhagat ki Kothi - Luni (28.4 km) A&C-3 |
| |
May 16 2011
Tender ID: 20110017 - “PROJECT MANAGEMENT CONSULTANCY SERVICES FOR CONSTRUCTION OF ROADBED, MAJOR & MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND LINE PSC SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORK IN CONNECTION WITH DOUBLING BETWEEN Bid Document. |
| |
May 13 2011
TENDER ID: 20110016 - DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF DYNAMIC CAPACITOR BANK(DRPC) AND RELATED WORKS IN THE TRACTION-SUB-STATION AT BALICHAK IN KHARAGPUR DIVISION OF SOUTH EASTERN RAILWAY IN THE STATE OF WEST BENGAL. Bid Document. |
| |
May 13 2011
Tender ID: 20110015 - CONSTRUCTION OF SHEDS, STRUCTURES, PORTA BLOCKS, WATER SUPPLY ARRANGEMENT, SEWERAGE, DRAINAGE, ROADS, TRACK, S&T, POWER SUPPLY ARRANGEMENT, GENRAL ELECTRICAL WORKS AND SUPPLY, ERECTION & COMMISSIONING OF MACHINERY & PLANT IN CONNECTI Bid Document. |
| |
May 09 2011
Tender ID: 20110008 - CONSTRUCTION OF ROADBED, MAJOR & MINOR BRIDGES, TUNNEL, TRACK LINKING (EXCLUDING SUPPLY OF RAILS, THICK WEB SWITCHES AND LINE PSC SLEEPERS), AND OHE & GENERAL ELECTRICAL WORKS IN CONNECTION WITH 3RD LINE BETWEEN GOELKERA AND POSOITA A&C-3 |
| |
May 09 2011
Tender ID: 20110014 - Open Tender 1. Package-I: CONSTRUCTION OF ROADBED, MAJOR AND MINOR BRIDGES AND TRACK LINKING (EXCLUDING SUPPLY OF RAILS, SLEEPERS AND THICK WEBS WITCHES) S&T AND GENRAL ELECTRICAL WORK IN ABU ROAD - SAROTRA ROAD (24.35 Kms) IN AJMER Bid Document. |
| |
May 06 2011
Tender ID: 20110011 - Construction of roadbed, major and minor bridges, civil works and track linking (excluding supply of rails and sleepers), general electrical work and S&T works in connection with doubling between Bhagat ki Kothi - Luni (28.4 km) A&C-2 and Minutes of Prebid Meeting. |
| |
May 04 2011
RVNL Foundation Day Function Click here to view. |
| |
May 02 2011
Tender ID: 20110008 - CONSTRUCTION OF ROADBED, MAJOR & MINOR BRIDGES, TUNNEL, TRACK LINKING (EXCLUDING SUPPLY OF RAILS, THICK WEB SWITCHES AND LINE PSC SLEEPERS), AND OHE & GENERAL ELECTRICAL WORKS IN CONNECTION WITH 3RD LINE BETWEEN GOELKERA AND POSOITA A&C-2 |
| |
Apr 27 2011
Tender ID: 20110008 - CONSTRUCTION OF ROADBED, MAJOR & MINOR BRIDGES, TUNNEL, TRACK LINKING (EXCLUDING SUPPLY OF RAILS, THICK WEB SWITCHES AND LINE PSC SLEEPERS), AND OHE & GENERAL ELECTRICAL WORKS IN CONNECTION WITH 3RD LINE BETWEEN GOELKERA AND POSOITA A&C-1 and Minutes of Prebid Meeting. |
| |
Apr 27 2011
Tender ID: 20110007 - “Design and Construction of 80 Units Multi Story (B+S+10) Type-V Flats for Railway Officers and Allied Works near Safadarjung Railway Station in Chankyapuri Area , New Delhi†A&C-2 and Minutes of Prebid Meeting. |
| |
Apr 26 2011
Tender ID: 20110013 - Proposed new BG line between Obulavaripalle and NETHAVARIPALLE – Br. No. 11 on GUNJANA RIVER – PROVISION OF PILE FOUNDATION AND PILE CAP FOR A CLEAR SPAN OF 14 X 17.45 M. IN KADAPPA DISTRICT IN SOUTH CENTRAL RAILWAY Bid Document. |
| |
Apr 21 2011
Tender ID: 20110007 - Design and Construction of 80 Units Multi Storey (B+S+10) Type-V Flats for Railway Officers and allied Works near Safadarjung Railway Station in Chankyapuri Area , New Delhi. A&C-1 |
| |
Apr 18 2011
Tender ID: 20110011 - Construction of roadbed, major and minor bridges, civil works and track linking (excluding supply of rails and sleepers), general electrical work and S&T works in connection with doubling between Bhagat ki Kothi - Luni (28.4 km) on J A&C 1. |
| |
Apr 15 2011
Tender ID: 20110012 - PROVISION OF MAINTENANCE FREE EARTH AS PER RDSO SPEC.NO RDSO/SPN/197/2008 AT 23 STATIONS IN GY-PMT SECTION OF GTL DIVISION OF SC RAILWAY IN CONNECTION WITH PATCH DOUBLING WORK OF GOOTY- PULLAMPET PROJECT ON GUNTAKAL DIVISION OF SOU Bid Document. |
| |
Apr 08 2011
Tender ID: 20110011 - Construction of roadbed, major and minor bridges, civil works and track linking (excluding supply of rails and sleepers), general electrical work and S&T works in connection with doubling between Bhagat ki Kothi - Luni (28.4 km) on J Bid Document. |
| |
Apr 05 2011
Tender ID: 20110004 - Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, Traction Sub-stations, SCADA, General Electrical Services works along with Signalling & Telecommunicati A&C-2 and Minutes of Prebid Meeting. |
| |
Apr 01 2011
Tender ID: 20110010 - DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF DYNAMIC CAPACITOR BANK(DRPC) AND RELATED WORKS IN THE TRACTION-SUB-STATION AT BALICHAK IN KHARAGPUR DIVISION OF SOUTH EASTERN RAILWAY IN THE STATE OF WEST BENGAL. TENDER CANCELATION NOTIFICATION. |
| |
Mar 31 2011
Tender : 20110010 - DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING OF DYNAMIC CAPACITOR BANK(DRPC) AND RELATED WORKS IN THE TRACTION-SUB-STATION AT BALICHAK IN KHARAGPUR DIVISION OF SOUTH EASTERN RAILWAY IN THE STATE OF WEST BENGAL. Bid Document. |
| |
Mar 30 2011
Tender ID: 20110003 - “DETAILED DESIGN CONSULTANCY SERVICES FOR SEVEN ELEVATED METRO STATIONS BETWEEN NEWGARIA (CH. 0.00) TO SCIENCE CITY ( CH. 8240.00) IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINEâ€. A&C 2 |
| |
Mar 26 2011
Walk in Interview to be held on 02.4.2011 A&C 1. |
| |
Mar 25 2011
WALK – IN – INTERVIEW to be held on 02.4.2011 Click here to view. |
| |
Mar 23 2011
Tender ID: 20110009 - Special Limited Tender for Conducting Final Location Survey, marking Centre Line, Soil Investigation and Detailed Design Engineering for Proposed Doubling of Swaroopganj-Abu Road (26.05 km) Section on Ajmer Division of North Western Bid Document. |
| |
Mar 22 2011
Tender ID: 20110008 - CONSTRUCTION OF ROADBED, MAJOR & MINOR BRIDGES, TUNNEL, TRACK LINKING (EXCLUDING SUPPLY OF RAILS, THICK WEB SWITCHES AND LINE PSC SLEEPERS), AND OHE & GENERAL ELECTRICAL WORKS IN CONNECTION WITH 3RD LINE BETWEEN GOELKERA AND POSOITA Bid Document. |
| |
Mar 18 2011
Tender ID : 20110004 - Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, Traction Sub-stations, SCADA, General Electrical Services works along with Signalling & Telecommunicat A&C 1. |
| |
Mar 17 2011
Tender ID: 20110005 - CONSTRUCTION OF ROADBED, MAJOR AND MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND PSC SLEEPERS) AND GENERAL ELECTRICAL WORKS IN CONNECTION WITH DOUBLING BETWEEN VENKATACHALAM ROAD JUNCTION AND KRISHNAPATNAM STATIONS (16. A&C 1. |
| |
Mar 15 2011
Tender ID: 20110003 - “DETAILED DESIGN CONSULTANCY SERVICES FOR SEVEN ELEVATED METRO STATIONS BETWEEN NEWGARIA (CH. 0.00) TO SCIENCE CITY (CH. 8240.00) IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINEâ€. A&C 1 and Minutes of Pre-bid Meeting. |
| |
Mar 15 2011
Tender ID : 20110001 - “DETAILED DESIGN CONSULTANCY SERVICES FOR APPROX. 7.0 KM LENGTH OF VIADUCT PORTION ALONG WITH SIDING IN BETWEEN & RELATED WORKS AND APPROACH SPANS OF THE STATIONS BUT EXCLUDING STATION AREAS FROM NEWGARIA TO SCIENCE CITY IN NEWGAR A&C 2 |
| |
Mar 14 2011
WALK – IN – INTERVIEW Click here to view. |
| |
Mar 10 2011
Tender ID: 20110007 - “Design and Construction of 80 Units Multi Storey (B+S+10) Type-V Flats for Railway Officers and allied Works near Safadarjung Railway Station in Chankyapuri Area , New Delhi†Bid Document. |
| |
Mar 03 2011
Tender ID: 20110006 - CONSTRUCTION OF SHEDS, STRUCTURES, PORTA BLOCKS, WATER SUPPLY ARRANGEMENT, SEWERAGE, DRAINAGE, ROADS, TRACK, S&T, POWER SUPPLY ARRANGEMENT, GENRAL ELECTRICAL WORKS AND SUPPLY, ERECTION & COMMISSIONING OF MACHINERY & PLANT IN CONNECTI A&C 1 and Pre-bid Minutes. |
| |
Feb 25 2011
Tender ID: 20110005 - CONSTRUCTION OF ROADBED, MAJOR AND MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND PSC SLEEPERS) AND GENERAL ELECTRICAL WORKS IN CONNECTION WITH DOUBLING BETWEEN VENKATACHALAM ROAD JUNCTION AND KRISHNAPATNAM STATIONS (16. Minutes of Pre-bid Meeting. |
| |
Feb 19 2011
Tender ID: 20110001 - “DETAILED DESIGN CONSULTANCY SERVICES FOR APPROX. 7.0 KM LENGTH OF VIADUCT PORTION ALONG WITH SIDING IN BETWEEN & RELATED WORKS AND APPROACH SPANS OF THE STATIONS BUT EXCLUDING STATION AREAS FROM NEWGARIA TO SCIENCE CITY IN NEWGAR A&C 1 and Minutes of Prebid Minutes. |
| |
Feb 18 2011
Tender ID: 20110006 - CONSTRUCTION OF SHEDS, STRUCTURES, PORTA BLOCKS, WATER SUPPLY ARRANGEMENT, SEWERAGE, DRAINAGE, ROADS, TRACK, S&T, POWER SUPPLY ARRANGEMENT, GENRAL ELECTRICAL WORKS AND SUPPLY, ERECTION & COMMISSIONING OF MACHINERY & PLANT IN CONNECTI Bid Document. |
| |
Feb 14 2011
Tender ID: 20100046 - Hubli Bye-pass work on South Western Railway (Bid Notification No.RVNL/Bangalore/HPT-TGT/Hubli Bye/ OT-1 pass dated 02.12.2010) Addl Clarifications offered by RVNL on the queries raised by the tenderers. |
| |
Feb 11 2011
Press Release - PM INAUGURATES COUNTRY’S LONGEST RAIL BRIDGE CONSTRUCTED BY RVNL Click here to view. |  |
| |
Feb 11 2011
RESIDENTIAL PREMISES REQUIRED Click here to view. |
| |
Feb 08 2011
Tender ID: 20110003 - “DETAILED DESIGN CONSULTANCY SERVICES FOR SEVEN ELEVATED METRO STATIONS BETWEEN NEWGARIA (CH. 0.00) TO SCIENCE CITY (CH. 8240.00) IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINEâ€. Bid Document. |
| |
Feb 04 2011
Tender ID: 20110005 - CONSTRUCTION OF ROADBED, MAJOR AND MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND PSC SLEEPERS) AND GENERAL ELECTRICAL WORKS IN CONNECTION WITH DOUBLING BETWEEN VENKATACHALAM ROAD JUNCTION AND KRISHNAPATNAM STATIONS (16. Bid Document. |
| |
Feb 04 2011
Tender ID: 20110004 - Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, Traction Sub-stations, SCADA, General Electrical Services works along with Signalling & Telecommunicati Bid Document. |
| |
Jan 31 2011
Tender ID: 20110003 - “DETAILED DESIGN CONSULTANCY SERVICES FOR SEVEN ELEVATED METRO STATIONS BETWEEN NEWGARIA (CH. 0.00) TO SCIENCE CITY (CH. 8240.00) IN NEWGARIA-AIRPORT CORRIDOR OF KOLKATA METRO RAILWAY LINEâ€. Tender Notice and EQC. |
| |
Jan 29 2011
Tender ID: 20110002 - SUPPLY, INSTALATION, MODIFICATION, TESTING, COMMISSIONING OF ELECTRONIC INTERLOCKING SYSTEM AT TAMLUK JN. CABIN , KESHABPUR, MAHISHADAL, BARDA, BASULYA SUTAHATA ON KHARAGPUR DIVISION OF SOUTH EASTERN RAILWAY IN STATE OF WEST BENGAL A A&C-1 and Minutes of Prebid Meeting. |
| |
Jan 28 2011
Result of Walk-in-Interview for the post of Technical Supervisor (Electrical) Click here to view. |
| |
Jan 21 2011
Tender ID: 20100046 - Hubli Bye-pass work on South Western Railway (Bid Notification No.RVNL/Bangalore/HPT-TGT/Hubli Bye/ OT-1 pass dated 02.12.2010) A&C-2 and Minutes of Prebid Meeting. |
| |
Jan 17 2011
WALK – IN INTERVIEW FOR THE POST OF COMPANY SECRETARY VACCANCY ADVERTISEMENT. |
| |
Jan 14 2011
Tender ID: 20100048 - RFP document to appoint a Consultant for Feasibility study for development of Freight Terminal at Holumbi Kakaln on Northern Railway. A&C-1 and Minutes of Pre-bid Meeting. |
| |
Jan 14 2011
Tender ID 20110001 - DETAILED DESIGN CONSULTANCY SERVICES FOR APPROX. 7.0 KM LENGTH OF VIADUCT PORTION ALONG WITH SIDING IN BETWEEN & RELATED WORKS AND APPROACH SPANS OF THE STATIONS BUT EXCLUDING STATION AREAS FROM NEWGARIA TO SCIENCE CITY IN NEWGARIA-A Bid Document. |
| |
Jan 11 2011
Tender ID: 20100046 - Hubli Bye-pass work on South Western Railway (Bid Notification No.RVNL/Bangalore/HPT-TGT/Hubli Bye/ OT-1 pass dated 02.12.2010) A&C-1 |
| |
Jan 10 2011
Tender ID: 20100038 - CONSTRUCTION OF ROADBED, SUPPLY OF BALLAST, MAJOR & MINOR BRIDGES, RESIDENTIAL AND SERVICE BUILDINGS & GENERAL ELECTRICAL WORK ETC.FOR KEOTI- ROWGHAT SECTION ( 53 Km) IN CONNECTION WITH A NEW RAIL LINK BETWEEN DALLIRAJHARA AND ROWGHA A&C-3 |
| |
Jan 08 2011
Tender ID: 20110002 - SUPPLY, INSTALATION, MODIFICATION, TESTING, COMMISSIONING OF ELECTRONIC INTERLOCKING SYSTEM AT TAMLUK JN. CABIN , KESHABPUR, MAHISHADAL, BARDA, BASULYA SUTAHATA ON KHARAGPUR DIVISION OF SOUTH EASTERN RAILWAY IN STATE OF WEST BENGAL A Bid Document. |
| |
Jan 06 2011
Tender ID 20110001- DETAILED DESIGN CONSULTANCY SERVICES FOR APPROX. 7.0 KM LENGTH OF VIADUCT PORTION ALONG WITH SIDING IN BETWEEN & RELATED WORKS AND APPROACH SPANS OF THE STATIONS BUT EXCLUDING STATION AREAS FROM NEWGARIA TO SCIENCE CITY IN NEWGARIA-A Tender Notice & EQC. |
| |
Jan 04 2011
Tender ID: 20100047 - Design and Construction of 80 Units Multi Story (B+S+10) Type-V Flats for Railway Officers and Allied Works near Safadarjung Railway Station in Chankyapuri Area , New Delhi. A&C-1 and Minutes of Pre-bid Meeting. |
| |
Jan 03 2011
Tender ID: 20100033 - PROVISION OF MAINTENANCE FREE EARTH AS PER RDSO SPEC.NO RDSO/SPN/197/2008 AT 23 STATIONS IN GY-PMT SECTION OF GTL DIVISION OF SC RAILWAY IN CONNECTION WITH PATCH DOUBLING WORK OF GOOTY- PULLAMPET PROJECT ON GUNTAKAL DIVISION OF SOU A&C-5 |
| |
Dec 24 2010
Tender ID: 20100048 - RFP document to appoint a Consultant for Feasibility study for development of Freight Terminal at Holumbi Kakaln on Northern Railway. Bid Document. |
| |
Dec 23 2010
Tender ID: 20100045 - EXECUTION OF DESIGN AND CONSTRUCTION OF PSC VIADUCT, EMBANKMENT AND STATIONS INCLUDING E&M WORKS IN CONNECTION WITH EXTENSION OF METRO RAILWAY LINE NOAPARA (EXCLUDING)-BARANAGAR-DAKSHINESWAR OF KOLKATA METRO Clarifications for Queries. |
| |
Dec 23 2010
Tender ID: 20100042 - “DETAILED DESIGN CONSULTANCY SERVICES FOR EIGHT ELEVATED METRO STATIONS BETWEEN JOKA (CH. 0.00) TO MOMINPUR (CH. 9700.00) IN JOKA-BBD BAG CORRIDOR OF KOLKATA METRO RAILWAY LINE.†A&C-2 |
| |
Dec 22 2010
Tender ID: 20100038 - CONSTRUCTION OF ROADBED, SUPPLY OF BALLAST, MAJOR & MINOR BRIDGES, RESIDENTIAL AND SERVICE BUILDINGS & GENERAL ELECTRICAL WORK ETC.FOR KEOTI- ROWGHAT SECTION ( 53 Km) IN CONNECTION WITH A NEW RAIL LINK BETWEEN DALLIRAJHARA AND ROWGHA A&C-2 & Minutes of Prebid Meeting. |
| |
Dec 20 2010
Tender ID: 20100042 - “DETAILED DESIGN CONSULTANCY SERVICES FOR EIGHT ELEVATED METRO STATIONS BETWEEN JOKA (CH. 0.00) TO MOMINPUR (CH. 9700.00) IN JOKA-BBD BAG CORRIDOR OF KOLKATA METRO RAILWAY LINE.†A&C-1 & Minutes of Prebid Meeting. |
| |
Dec 18 2010
Tender ID: 20100038 - CONSTRUCTION OF ROADBED, SUPPLY OF BALLAST, MAJOR & MINOR BRIDGES, RESIDENTIAL AND SERVICE BUILDINGS & GENERAL ELECTRICAL WORK ETC.FOR KEOTI- ROWGHAT SECTION ( 53 Km) IN CONNECTION WITH A NEW RAIL LINK BETWEEN DALLIRAJHARA AND ROWGHA A&C-1 |
| |
Dec 17 2010
Tender ID: 20100036 - CONSTRUCTION OF ROADBED, MAJOR BRIDGES, MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS, THICK WEB SWITCHES AND PSC LINE SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORKS IN CONNECTION WITH DOUBLING BETWEEN JAROLI (INCL) AND Clarification to Supplementry Queries |
| |
Dec 17 2010
Tender ID: 20100043 - RFP of Bankability study of Rayadurg- Tumkur (206.53Kms) New Line in South Western Railway. A&C-1 & Minutes of Prebid Meeting. |
| |
Dec 17 2010
Tender ID: 20100033 - PROVISION OF MAINTENANCE FREE EARTH AS PER RDSO SPEC.NO RDSO/SPN/197/2008 AT 23 STATIONS IN GY-PMT SECTION OF GTL DIVISION OF SC RAILWAY IN CONNECTION WITH PATCH DOUBLING WORK OF GOOTY- PULLAMPET PROJECT ON GUNTAKAL DIVISION OF SOU A&C-4 |
| |
Dec 10 2010
Tender ID: 20100041 - RFP of Bankability study of Dharwad- Belgaum (97.00 Kms) New Line in South Western Railway. Addendum/Corrigendum No.1 |
| |
Dec 07 2010
Tender ID: 20100047 - “Design and Construction of 80 Units Multi Story (B+S+10) Type-V Flats for Railway Officers and Allied Works near Safadarjung Railway Station in Chankyapuri Area , New Delhi” Bid Document. |
| |
Dec 07 2010
Tender ID: 20100040 - RFP of Bankability study of Bijapur-Shahabad (156.60 Kms) New Line in South Western Railway. Addendum/Corrigendum No.1 and Minutes of Prebid Meeting. |
| |
Dec 03 2010
Tender ID: 20100045 - “EXECUTION OF DESIGN AND CONSTRUCTION OF PSC VIADUCT, EMBANKMENT AND STATIONS INCLUDING E&M WORKS IN CONNECTION WITH EXTENSION OF METRO RAILWAY LINE NOAPARA (EXCLUDING)-BARANAGAR-DAKSHINESWAR OF KOLKATA METRO”. Bid document and Addendum/Corrigendum No.1 |
| |
Dec 03 2010
Tender ID: 20100046 - Hubli Bye-pass work on South Western Railway (Bid Notification No.RVNL/Bangalore/HPT-TGT/Hubli Bye/ OT-1 pass dated 02.12.2010) Bid Document. |
| |
Dec 01 2010
Tender ID: 20100036 - “CONSTRUCTION OF ROADBED, MAJOR BRIDGES, MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS, THICK WEB SWITCHES AND PSC LINE SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORKS IN CONNECTION WITH DOUBLING BETWEEN JAROLI (INCL) AND Addendum/Corrigendum No.2 and Minutes of Prebid Meeting. |
| |
Nov 30 2010
Tender ID: 20100045 - “DESIGN AND CONSTRUCTION OF PSC VIADUCT, EMBANKMENT AND STATIONS IN CONNECTION WITH EXTENSION OF METRO RAILWAY LINE NOAPARA (EXCLUDING)-BARANAGAR-DAKSHINESWAR OF KOLKATA METRO”. Tender Notice. |
| |
Nov 30 2010
Tender ID 20100033 - PROVISION OF MAINTENANCE FREE EARTH AS PER RDSO SPEC.NO RDSO/SPN/197/2008 AT 23 STATIONS IN GY-PMT SECTION OF GTL DIVISION OF SC RAILWAY IN CONNECTION WITH PATCH DOUBLING WORK OF GOOTY- PULLAMPET PROJECT ON GUNTAKAL DIVISION OF SOUT Addendum/Corrigendum No.3 |
| |
Nov 29 2010
Tender ID: 20100039 - “DETAILED DESIGN CONSULTANCY SERVICES FOR APPROX. 9.51 KM LENGTH VIADUCT PORTION ALONG WITH SIDINGS IN BETWEEN & RELATED WORKS AND APPROACH SPANS OF THE STATIONS BUT EXCLUDING STATION AREAS FROM CH. (-)1250.00 TO CH. 9700.00 BETWEEN Addendum/Corrigendum No.1 and Minutes of Prebid Meeting. |
| |
Nov 26 2010
Tender ID: 20100044 - Special Limited Tender for Conducting Final Location Survey, marking centre line, soil investigation and Detail Design Engineering for purposed doubling of Abu Road- Karjoda (50.2 km) section on Ajmer division of North Western Railwa Bid Document. |
| |
Nov 26 2010
Tender ID: 20100043 - RFP of Bankability study of Rayadurg- Tumkur (206.53Kms) New Line in South Western Railway. Request for Proposal. |
| |
Nov 24 2010
Tender ID: 20100042 - DETAILED DESIGN CONSULTANCY SERVICES FOR EIGHT ELEVATED METRO STATIONS BETWEEN JOKA (CH. 0.00) TO MOMINPUR (CH. 9700.00) IN JOKA-BBD BAG CORRIDOR OF KOLKATA METRO RAILWAY LINE. Request for Proposal. |
| |
Nov 19 2010
Tender ID: 20100042 - “DETAILED DESIGN CONSULTANCY SERVICES FOR EIGHT ELEVATED METRO STATIONS BETWEEN JOKA (CH. 0.00) TO MOMINPUR (CH. 9700.00) IN JOKA-BBD BAG CORRIDOR OF KOLKATA METRO RAILWAY LINE”. Tender Notice and EQC. |
| |
Nov 19 2010
Tender ID: 20100041 - RFP of Bankability study of Dharwad- Belgaum (97.00 Kms) New Line in South Western Railway. Request For Proposal. |
| |
Nov 16 2010
Tender ID: 20100034 - CONSTRUCTION OF ROADBED, MAJOR & MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND LINE PSC SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORK IN CONNECTION WITH DOUBLING BETWEEN TAMLUK (JUNCTION CABIN) – BASULYA SUTAHATA (24 Addendum/Corrigendum No.2 |
| |
Nov 13 2010
Tender ID: 20100035 - Expression of Interest for Empanelment of Agencies for the work of “Project Management Consultancy (PMC) of Railway projects to be undertaken by Rail Vikas Nigam Limited”. Addendum/Corrigendum No.2 and Minutes of Prebid Meeting. |
| |
Nov 12 2010
Tender ID: 20100040 - RFP of Bankability study of Bijapur-Shahabad (156.60 Kms) New Line in South Western Railway. Request for Proposal. |
| |
Nov 09 2010
Tender ID: 20100039 - DETAILED DESIGN CONSULTANCY SERVICES FOR APPROX. 9.51 KM LENGTH VIADUCT PORTION ALONG WITH SIDINGS IN BETWEEN & RELATED WORKS AND APPROACH SPANS OF THE STATIONS BUT EXCLUDING STATION AREAS FROM CH. (-)1250.00 TO CH. 9700.00 BETWEEN Request for Proposal. |
| |
Nov 09 2010
Tender ID: 20100037 - Project Management Consultancy for “Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, and other associated works, TSS at BELVANDI, NIMBLAK, PADHEGAO Minutes of Pre-bid Meeting. |
| |
Nov 09 2010
1.Package-I:Construction of viaduct including related works for 4.748 km length excluding station areas from CH.(-)1250 to CH.4128.00 between Joka to Behala Chowrasta including depot approach at Joka, in Joka-BBD Bag corridor of Kolkata Metro Railway Line Addendum/Corrigendum No.3 |
| |
Nov 03 2010
DETAILED DESIGN CONSULTANCY SERVICES FOR APPROX. 9.51 KM LENGTH VIADUCT PORTION ALONG WITH SIDINGS IN BETWEEN & RELATED WORKS AND APPROACH SPANS OF THE STATIONS BUT EXCLUDING STATION AREAS FROM CH. (-)1250.00 TO CH. 9700.00 BETWEEN JOKA TO MOMINPUR IN J Request For Proposal. |
| |
Nov 03 2010
Tender ID: 20100034 - CONSTRUCTION OF ROADBED, MAJOR & MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND LINE PSC SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORK IN CONNECTION WITH DOUBLING BETWEEN TAMLUK (JUNCTION CABIN) – BASULYA SUTAHATA (24 Addendum/Corrigendum No.1, Minutes of Pre-bid Meeting and Drawings. |
| |
Nov 02 2010
Tender ID: 20100038 - CONSTRUCTION OF ROADBED, SUPPLY OF BALLAST, MAJOR & MINOR BRIDGES, RESIDENTIAL AND SERVICE BUILDINGS & GENERAL ELECTRICAL WORK ETC.FOR KEOTI- ROWGHAT SECTION ( 53 Km) IN CONNECTION WITH A NEW RAIL LINK BETWEEN DALLIRAJHARA AND ROWG Bid Document. |
| |
Oct 29 2010
Tender ID: 20100035 - Empanelment of Agencies for the work of “Project Management Consultancy (PMC) of Railway projects to be undertaken by Rail Vikas Nigam Limited”. Addendum/Corrigendum No.1 and Minutes of Prebid Meeting. |
| |
Oct 27 2010
“PROJECT MANAGMENT CONSULTANCY FOR CONSTRUCTION OF ROADBED, MAJOR AND MINOR BRIDGES AND TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND PSC LINE SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORK IN CONNECTION WITH NEW LINE BETWEEN DANKUNI - FURFURA SHARIF (20 Addendum/Corrigendum No.2 and Minutes of Prebid Meeting. |
| |
Oct 26 2010
Publishing of RVNL Magazine Click here to view. |
| |
Oct 26 2010
Tender ID: 20100033 - PROVISION OF MAINTENANCE FREE EARTH AS PER RDSO SPEC.NO RDSO/SPN/197/2008 AT 23 STATIONS IN GY-PMT SECTION OF GTL DIVISION OF SC RAILWAY IN CONNECTION WITH PATCH DOUBLING WORK OF GOOTY- PULLAMPET PROJECT ON GUNTAKAL DIVISION OF SOU Addendum/Corrigendum No.1 & 2 |
| |
Oct 25 2010
Tender ID: 20100036 - CONSTRUCTION OF ROADBED, MAJOR BRIDGES, MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS, THICK WEB SWITCHES AND PSC LINE SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORKS IN CONNECTION WITH DOUBLING BETWEEN JAROLI (INCL) AND Addendum/Corrigendum No.1 |
| |
Oct 22 2010
Request for Proposal for carrying out Detailed design Consultancy & Construction Supervision for the proposed 4- lane Cable Stayed Road over Bridge over Barddhaman yard in lieu of existing 2-lane ROB Bridge No.-213 of Eastern Railway in the State of West Addendum/Corrigendum No.1 and Minutes of Prebid Meeting. |
| |
Oct 21 2010
1.Package-I:Construction of viaduct including related works for 4.748 km length excluding station areas from CH.(-)1250 to CH.4128.00 between Joka to Behala Chowrasta including depot approach at Joka, in Joka-BBD Bag corridor of Kolkata Metro Railway Line Addendum/Corrigendum No.2 and Minutes of Prebid Meeting. |
| |
Oct 18 2010
Project Management Consultancy for “Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, and other associated works, TSS at BELVANDI, NIMBLAK, PADHEGAON & KOPARGAON, SCADA Bid Document |
| |
Oct 08 2010
CONSTRUCTION OF ROADBED, MAJOR BRIDGES, MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS, THICK WEB SWITCHES AND PSC LINE SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORKS IN CONNECTION WITH DOUBLING BETWEEN JAROLI (INCL) AND JAKHAPURA (INCL) (170. Bid Document. |
| |
Oct 06 2010
CONSTRUCTION OF SHEDS, STRUCTURES, PORTA BLOCKS, WATER SUPPLY ARRANGEMENT, SEWERAGE, DRAINAGE, ROADS, TRACK, S&T, POWER SUPPLY ARRANGEMENT, GENERAL ELECTRICAL WORKS AND SUPPLY, ERECTION & COMMISSIONING OF MACHINERY & PLANT IN CONNECTION WITH SETTING UP OF Addendum/Corrigendum No.2 |
| |
Oct 05 2010
1.Package-I:Construction of viaduct including related works for 4.748 km length excluding station areas from CH.(-)1250 to CH.4128.00 between Joka to Behala Chowrasta including depot approach at Joka, in Joka-BBD Bag corridor of Kolkata Metro Railway Line Bid document. |
| |
Oct 05 2010
CONSTRUCTION OF SHEDS, STRUCTURES, PORTA BLOCKS, WATER SUPPLY ARRANGEMENT, SEWERAGE, DRAINAGE, ROADS, TRACK, S&T, POWER SUPPLY ARRANGEMENT, GENERAL ELECTRICAL WORKS AND SUPPLY, ERECTION & COMMISSIONING OF MACHINERY & PLANT IN CONNECTION WITH SETTING UP OF A&C-1 and SOR |
| |
Oct 05 2010
“PROJECT MANAGMENT CONSULTANCY FOR CONSTRUCTION OF ROADBED, MAJOR AND MINOR BRIDGES AND TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND PSC LINE SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORK IN CONNECTION WITH NEW LINE BETWEEN DANKUNI - FURFURA SHARIF (20 A&C-1 |
| |
Oct 05 2010
1.Package-I:Construction of viaduct including related works for 4.748 km length excluding station areas from CH.(-)1250 to CH.4128.00 between Joka to Behala Chowrasta including depot approach at Joka, in Joka-BBD Bag corridor of Kolkata Metro Railway Line IFB and A&C-1 |
| |
Oct 01 2010
Expression of Interest for Empanelment of Agencies for the work of “Project Management Consultancy (PMC) of Railway projects to be undertaken by Rail Vikas Nigam Limited”. Bid Document |
| |
Oct 01 2010
CONSTRUCTION OF ROADBED, MAJOR & MINOR BRIDGES, TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND LINE PSC SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORK IN CONNECTION WITH DOUBLING BETWEEN TAMLUK (JUNCTION CABIN) – BASULYA SUTAHATA (24.4 KM) IN KHARAGPUR DI Bid Document. |
| |
Sep 30 2010
Expression of Interest(EOI) for Empanelment of Consultants for undertaking Traffic and Bankability Studies Addendum/Corrigendum No.1 and Minutes of Prebid Meeting. |
| |
Sep 29 2010
PROJECT MANAGMENT CONSULTANCY FOR CONSTRUCTION OF ROADBED, MAJOR AND MINOR BRIDGES AND TRACK LINKING (EXCLUDING SUPPLY OF RAILS AND PSC LINE SLEEPERS), S&T AND OHE & GENERAL ELECTRICAL WORK IN CONNECTION WITH NEW LINE BETWEEN DANKUNI - FURFURA SHARIF (20 Bid Document. |
| |
Sep 28 2010
Construction of viaduct including related works for 4.748 km length excluding station areas from CH.(-)1250 to CH.4128.00 between Joka to Behala Chowrasta including depot approach at Joka, in Joka-BBD Bag corridor of Kolkata Metro Railway Line. Evaluation & Qualification Criteria. |
| |
Sep 25 2010
CONSTRUCTION OF BRIDGE NO. 12 ACROSS RIVER BRAHMANI AND BRIDGE NO. 29 AND 41 ACROSS RENGALI LEFT MAIN CANAL IN CONNECTION WITH CONSTRUCTION OF NEW LINE BETWEEN TALCHER ROAD AND BAGHUAPAL STATIONS OF ANGUL-SUKINDA ROAD NEW RAILWAY LINE CONSTRUCTION PROJECT Addendum/Corrigendum No.1 and Minutes of Prebid Meeting. |
| |
Sep 21 2010
Request for Proposal for carrying out Detailed design Consultancy & Construction Supervision for the proposed 4-lane Cable Stayed Road over Bridge over Barddhaman yard in lieu of existing 2-lane ROB Bridge No.-213 of Eastern Railway in the State of West B Bid Document. |
| |
Sep 16 2010
CONSTRUCTION OF SHEDS, STRUCTURES, PORTA BLOCKS, WATER SUPPLY ARRANGEMENT, SEWERAGE, DRAINAGE, ROADS, TRACK, S&T, POWER SUPPLY ARRANGEMENT, GENERAL ELECTRICAL WORKS AND SUPPLY, ERECTION & COMMISSIONING OF MACHINERY & PLANT IN CONNECTION WITH SETTING UP OF Bid Document. |
| |
Sep 10 2010
PROJECT MANAGMENT CONSULTANCY FOR CONSTRUCTION OF STRUCTURAL SHED WITH GANTRY, ADMINISTRATIVE AND OTHER BUILDINGS ALONG WITH ANCILLARY WORKS (Civil, Tele Communication, Illumination and Electrification) IN CONNECTION WITH SETTING UP OF DIESEL LOCO COMPONE Addendum/Corrigendum No.2 |
| |
Sep 08 2010
RFP document to appoint a Consultant for Bankability study of Khurda Road – Bolangir New Line on East Coast Railway. Addendum/Corrigendum No.1 and Minutes of Prebid Meeting. |
| |
Sep 06 2010
RFP document to appoint a Consultant for Bankability study of Khurda Road – Bolangir New Line on East Coast Railway. Addendum/Corrigendum No.1 |
| |
Sep 03 2010
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRONIC INTERLOCKING SYSTEM AT SILYARI, MANDHAR AND URKURA STATIONS IN CONNECTION WITH THE WORK OF 3RD LINE BETWEEN BHATAPARA AND URKURA ON RAIPUR DIVISION OF SOUTH EAST CENTRAL RAILWAY IN THE STATE OF Addendum/Corrigendum No. 5 |
| |
Sep 01 2010
Expression of Interest(EOI) for Empanelment of Consultants for undertaking Traffic and Bankability Studies Bid Document. |
| |
Aug 27 2010
RFP document to appoint a Consultant for Bankability study of Khurda Road – Bolangir New Line on East Coast Railway. Bid Document |
| |
Aug 26 2010
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRONIC INTERLOCKING SYSTEM AT SILYARI, MANDHAR AND URKURA STATIONS IN CONNECTION WITH THE WORK OF 3RD LINE BETWEEN BHATAPARA AND URKURA ON RAIPUR DIVISION OF SOUTH EAST CENTRAL RAILWAY IN THE STATE OF A&C_4 |
| |
Aug 24 2010
PROJECT MANAGMENT CONSULTANCY FOR CONSTRUCTION OF STRUCTURAL SHED WITH GANTRY, ADMINISTRATIVE AND OTHER BUILDINGS ALONG WITH ANCILLARY WORKS (Civil, Tele Communication, Illumination and Electrification) IN CONNECTION WITH SETTING UP OF DIESEL LOCO COMPONE Addendum/Corrigendum No.1 and Minutes of Prebid Meeting. |
| |
Aug 22 2010
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRONIC INTERLOCKING SYSTEM AT SILYARI, MANDHAR AND URKURA STATIONS IN CONNECTION WITH THE WORK OF 3RD LINE BETWEEN BHATAPARA AND URKURA ON RAIPUR DIVISION OF SOUTH EAST CENTRAL RAILWAY IN THE STATE OF Addendum/Corrigendum No. 3 |
| |
Aug 20 2010
Project Management Consultancy for “Construction of Roadbed, Major and Minor Bridges, Track Linking, Tunnel, S&T and OHE, TSS & General Electrical Works in Connection with Construction of 3rd Line Between Goelkera - Manoharpur (27.5 Km) on Chakradharpur D Addendum/Corrigendum No.1 and Minutes of Prebid Meeting. |
| |
Aug 19 2010
RFP for Bankability study of Cudappah-Bangalore New Line in South Central Railway. Addendum/Corrigendum No.1 and Minutes of Prebid Meeting. |
| |
Aug 16 2010
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRONIC INTERLOCKING SYSTEM AT SILYARI, MANDHAR AND URKURA STATIONS IN CONNECTION WITH THE WORK OF 3RD LINE BETWEEN BHATAPARA AND URKURA ON RAIPUR DIVISION OF SOUTH EAST CENTRAL RAILWAY IN THE STATE OF Addendum/Corrigendum No.2 |
| |
Aug 13 2010
RFP for Bankability study of Cudappah-Bangalore New Line in South Central Railway. Bid Document. |
| |
Aug 13 2010
Housekeeping Services at Corporate Office of RVNL Bid Document. |
| |
Aug 09 2010
CONSTRUCTION OF BRIDGE NO. 12 ACROSS RIVER BRAHMANI AND BRIDGE NO. 29 AND 41 ACROSS RENGALI LEFT MAIN CANAL IN CONNECTION WITH CONSTRUCTION OF NEW LINE BETWEEN TALCHER ROAD AND BAGHUAPAL STATIONS OF ANGUL-SUKINDA ROAD NEW RAILWAY LINE CONSTRUCTION PROJECT Bid Document. |
| |
Aug 03 2010
CONSTRUCTION OF NEW LINE BETWEEN DANKUNI-FURFURA SHARIF VIA JANGALPARA IN HOWRAH DIVISION OF EASTERN RAILWAY (20KM) IN THE STATE OF WEST BENGAL, INDIA. Addendum/Corrigendum No. 2 |
| |
Aug 02 2010
CONSTRUCTION OF STRUCTURAL SHED WITH GANTRY, ADMINISTRATIVE AND OTHER BUILDINGS ALONG WITH ANCILLARY WORKS (Civil, Tele Communication, Illumination and Electrification) IN CONNECTION WITH SETTING UP OF DIESEL LOCO COMPONENT FACTORY FOR MANUFACTURING AND S Bid Document. |
| |
Jul 29 2010
“EXECUTION OF DESIGN AND CONCTRUCTION OF PSC VIADUCT, EMBANKMENT AND STATIONS INCLUDING E&M WORKS IN CONNECTION WITH EXTENSION OF METRO RAILWAY LINE NOAPARA (EXCLUDING)-BARANAGAR-DAKSHINESWAR OF KOLKATA METRO” Addendum/Corrigendum No. 3 |
| |
Jul 28 2010
CONSTRUCTION OF ROADBED, SUPPLY OF BALLAST, MAJOR & MINOR BRIDGES, P.WAY & TRACK LINKING ETC. FOR FLY OVER AT BILASPUR IN BILASPUR DIVISION OF SOUTH EAST CENTRAL RAILWAY IN THE STATE OF CHHATTISGARH, INDIA Addendum/Corrigendum No. 2 |
| |
Jul 27 2010
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRONIC INTERLOCKING SYSTEM AT SILYARI, MANDHAR AND URKURA STATIONS IN CONNECTION WITH THE WORK OF 3RD LINE BETWEEN BHATAPARA AND URKURA ON RAIPUR DIVISION OF SOUTH EAST CENTRAL RAILWAY IN THE STATE OF Addendum/Corrigendum No. 1. |
| |
Jul 23 2010
Construction of Roadbed, Major and Minor Bridges, Track Linking, Tunnel, S&T and OHE, TSS & General Electrical Works in Connection with Construction of 3rd Line Between Goelkera- Manoharpur (27.5 Km) on Chakradharpur Division of South Eastern Railway in J Bid Document. |
| |
Jul 23 2010
“EXECUTION OF DESIGN AND CONCTRUCTION OF PSC VIADUCT, EMBANKMENT AND STATIONS INCLUDING E&M WORKS IN CONNECTION WITH EXTENSION OF METRO RAILWAY LINE NOAPARA (EXCLUDING)-BARANAGAR-DAKSHINESWAR OF KOLKATA METRO” Addendum/Corrigendum No. 2 & Prebid Minutes. |
| |
Jul 23 2010
CONSTRUCTION OF NEW LINE BETWEEN DANKUNI-FURFURA SHARIF VIA JANGALPARA IN HOWRAH DIVISION OF EASTERN RAILWAY (20KM) IN THE STATE OF WEST BENGAL, INDIA. Addendum/Corrigendum No. 1 & Prebid Minutes. |
| |
Jul 23 2010
Project Management Consultancy for Proposed Doubling of track between Dindigul and Villupuram – Execution of earthwork in formation, major and minor bridges, station buildings, staff quarters, general electrical works, Overhead Electrification works, Perm Addendum/Corrigendum No. 3 |
| |
Jul 20 2010
Supply, Installation, Testing and Commissioning of Electronic Interlocking system at Silyari, Mandhar and Urkura stations in connection with the work of 3rd line between Bhatapara and Urkura on Raipur Division of South East Central Railway in the state of Bid Document. |
| |
Jul 16 2010
PROJECT MANAGEMENT CONSULTANCY FOR “Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding supply of Rails, Thick web Switches and line sleepers) S&T and OHE & General Electrical Work in Connection with Doubling Between Rajgoda-Taml Addendum/Corrigendum No. 1 |
| |
Jul 09 2010
“CONSTRUCTION OF ROADBED, SUPPLY OF BALLAST, MAJOR & MINOR BRIDGES, P.WAY & TRACK LINKING ETC. FOR FLY OVER AT BILASPUR IN BILASPUR DIVISION OF SOUTH EAST CENTRAL RAILWAY IN THE STATE OF CHHATTISGARH, INDIA “ Addendum/Corrigendum No. 1 |
| |
Jul 02 2010
“DESIGN AND CONSTRUCTION OF PSC VIADUCT, EMBANKMENT AND STATIONS IN CONNECTION WITH EXTENSION OF METRO RAILWAY LINE NOAPARA (EXCUUDING)- BARANAGAR-DAKSHINESWAR OF KOLKATA METRO.” Addendum/Corrigendum No. 1 & Drawings. |
| |
Jul 01 2010
Project Management Consultancy for Proposed Doubling of track between Dindigul and Villupuram – Execution of earthwork in formation, major and minor bridges, station buildings, staff quarters, general electrical works, Overhead Electrification works, Perm Addendum/Corrigendum No. 1 |
| |
Jul 01 2010
Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, and other associated works, TSS at BELVANDI, NIMBLAK, PADHEGAON & KOPARGAON, SCADA and associated Signalling & Telecom Addendum/Corrigendum No. 1 & Prebid Minutes.
|
| |
Jun 30 2010
Quotation for Hiring of independent Floor For transit accommodation for RVNL. Addendum/Corrigendum No. 1 |
| |
Jun 30 2010
CONSTRUCTION OF NEW LINE BETWEEN DANKUNI-FURFURA SHARIF VIA JANGALPARA IN HOWRAH DIVISION OF EASTERN RAILWAY (20KM) IN THE STATE OF WEST BENGAL, INDIA. Bid Document. |
| |
Jun 29 2010
PROJECT MANAGEMENT CONSULTANCY FOR Proposed Doubling of track between Dindigul and Villupuram – Execution of major and precast minor bridges between Villupuram to Ariyalur and Valadi to Dindigul in Southern Railway Addendum/Corrigendum No. 1 |
| |
Jun 28 2010
Provision of Doubling of track between Ariyalur and Valadi – Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails), Electrical (Railway Electrification and General Electrification), signalling and telecommu Addendum/Corrigendum No. 5 |
| |
Jun 26 2010
“DESIGN AND CONSTRUCTION OF PSC VIADUCT, EMBANKMENT AND STATIONS IN CONNECTION WITH EXTENSION OF METRO RAILWAY LINE NOAPARA (EXCLUDING)-BARANAGAR-DAKSHINESWAR OF KOLKATTA METRO”. Bid Document. |
| |
Jun 25 2010
Provision of Doubling of track between Ariyalur and Valadi – Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails), Electrical (Railway Electrification and General Electrification), signalling and telecommu Addendum/Corrigendum No. 4 |
| |
Jun 21 2010
Provision of Doubling of track between Ariyalur and Valadi – Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails), Electrical (Railway Electrification and General Electrification), signalling and telecommu Addendum/Corrigendum No. 3 |
| |
Jun 17 2010
Provision of Doubling of track between Ariyalur and Valadi – Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails), Electrical (Railway Electrification and General Electrification), signalling and telecommu Addendum/Corrigendum No. 2 |
| |
Jun 16 2010
Project Management Consultancy for Proposed Doubling of track between Dindigul and Villupuram – Execution of earthwork in formation, major and minor bridges, station buildings, staff quarters, general electrical works, Overhead Electrification works, Perm Bid Document. |
| |
Jun 14 2010
PROJECT MANAGEMENT CONSULTANCY FOR “Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding supply of Rails, Thick web Switches and line sleepers) S&T and OHE & General Electrical Work in Connection with Doubling Between Rajgoda-Taml Bid Document. |
| |
Jun 11 2010
Conducting Final Location Survey, Marking Centre Line, Soil Investigation and Detailed Design Engineering for Proposed Doubling of Tamluk (Junction Cabin)- Basulya Sutahata (24.4Kms) Section on Kharagpur Division of South Eastern Railway. Addendum/Corrigendum No. 1 |
| |
Jun 10 2010
Design, Supply, Erection, Testing & Commissioning of 25 KV, 50HZ, Single Phase, Traction Over-head Equipment, Switching Stations, and other associated works, TSS at BELVANDI, NIMBLAK, PADHEGAON & KOPARGAON, SCADA and associated Signalling & Telecom Bid Document. |
| |
Jun 08 2010
Provision of Doubling of track between Ariyalur and Valadi – Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails), Electrical (Railway Electrification and General Electrification), signalling and telecommu Addendum/Corrigendum No. 1 & Prebid Minutes. |
| |
Jun 02 2010
“CONSTRUCTION OF ROADBED, SUPPLY OF BALLAST, MAJOR & MINOR BRIDGES, P.WAY & TRACK LINKING ETC. FOR FLY OVER AT BILASPUR IN BILASPUR DIVISION OF SOUTH EAST CENTRAL RAILWAY IN THE STATE OF CHHATTISGARH, INDIA “ Bid Document. |
| |
May 31 2010
Proposed Doubling of track between Dindigul and Villupuram – Execution of major and precast minor bridges from Villupuram to Ariyalur and from Valadi to Dindigul in Tiruchchirappalli Division of Southern Railway Addendum/Corrigendum No. 4 |
| |
May 26 2010
PROJECT MANAGEMENT CONSULTANCY FOR Proposed Doubling of track between Dindigul and Villupuram – Execution of major and precast minor bridges between Villupuram to Ariyalur and Valadi to Dindigul in Southern Railway Bid Document. |
| |
May 26 2010
Proposed Doubling of track between Dindigul and Villupuram – Execution of major and precast minor bridges from Villupuram to Ariyalur and from Valadi to Dindigul in Tiruchchirappalli Division of Southern Railway Addendum/Corrigendum No. 3 |
| |
May 25 2010
CONSTRUCTION OF STRUCTURAL SHED WITH GANTRY, ADMINISTRATIVE AND OTHER BUILDINGS ALONG WITH ANCILLARY WORKS (CIVIL, TELECOMMUNICATION, ILLUMINATION AND ELECTRIFICATION) IN CONNECTION WITH SETTING UP OF DIESEL LOCO COMPONENT FACTORY FOR MANUFACTURING AND SU Addendum/Corrigendum No. 2
|
| |
May 20 2010
CONSTRUCTION OF STRUCTURAL SHED WITH GANTRY, ADMINISTRATIVE AND OTHER BUILDINGS ALONG WITH ANCILLARY WORKS (CIVIL, TELECOMMUNICATION, ILLUMINATION AND ELECTRIFICATION) IN CONNECTION WITH SETTING UP OF DIESEL LOCO COMPONENT FACTORY FOR MANUFACTURING AND SU Addendum/Corrigendum No. 1 & Prebid Meeting Minutes. |
| |
May 17 2010
Provision of Rail Connectivity from Idappalli to International Container Transhipment Terminal, Vallarpadam – Construction of Inspection platform with hand rails for the elevated structure, provision of guide piles for the navigational channel and pile bu Addendum/Corrigendum No. 1 |
| |
May 17 2010
Proposed Doubling of track between Dindigul and Villupuram – Execution of major and precast minor bridges from Villupuram to Ariyalur and from Valadi to Dindigul in Tiruchchirappalli Division of Southern Railway Addendum/Corrigendum No. 2 |
| |
May 13 2010
Design, supply, erection, testing & commissioning of 132/27 KV, 2 x 30/42 MVA, Traction-Sub-station, feeding post and with other associated works at Goilkera in GOL-PST section under Chakradharpur Division of South Eastern Railway, in the State of Jharkh Addendum/Corrigendum No. 1 & Prebid Minutes. |
| |
May 13 2010
Proposed Doubling of track between Dindigul and Villupuram – Execution of major and precast minor bridges from Villupuram to Ariyalur and from Valadi to Dindigul in Tiruchchirappalli Division of Southern Railway Addendum/Corrigendum No. 1 & Prebid Minutes. |
| |
May 12 2010
Conducting Final Location Survey, Marking Centre Line, Soil Investigation and Detailed Design Engineering for Proposed Doubling of Tamluk (Junction Cabin)- Basulya Sutahata (24.4Kms) Section on Kharagpur Division of South Eastern Railway. Bid Document. |
| |
May 10 2010
PMC for Proposed provision of 4th line between Tiruvallur and Arakkonam – Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & thick web switches), Electrical (Railway Electrification and General Electrif Addendum/Corrigendum No. 1 |
| |
May 04 2010
Provision of Rail Connectivity from Idappalli to International Container Transhipment Terminal, Vallarpadam – Construction of Inspection platform with hand rails for the elevated structure, provision of guide piles for the navigational channel and pile bu Bid Document. |
| |
Apr 30 2010
Provision of Doubling of track between Ariyalur and Valadi – Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails), Electrical (Railway Electrification and General Electrification), signalling and telecommu Bid Document. |
| |
Apr 29 2010
CONSTRUCTION OF STRUCTURAL SHED WITH GANTRY, ADMINISTRATIVE AND OTHER BUILDINGS ALONG WITH ANCILLARY WORKS (Civil, Tele Communication, Illumination and Electrification) IN CONNECTION WITH SETTING UP OF DIESEL LOCO COMPONENT FACTORY FOR MANUFACTURING AND S Bid Document. |
| |
Apr 19 2010
Design, supply, erection, testing & commissioning of 132/27 KV, 2 x 30/42 MVA, Traction-Sub-station, feeding post and with other associated works at Goilkera in GOL-PST section under Chakradharpur Division of South Eastern Railway, in the State of Jharkh Bid Document. |
| |
Apr 15 2010
Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails and Sleepers, Thick Webs Switches and Special Sleepers) S&T and OHE & General Electrical Work in Connection with Doubling Between Rajgoda – Tamluk (Junction Cabi Addendum/Corrigendum No. 2 & Pre-bid Meeting Minutes. |
| |
Apr 13 2010
Project Management Consultancy for Proposed new BG line between Obulavaripalle and Venkatachalam – Execution of earthwork in formation, bridges, road under bridges, station buildings, staff quarters, general electrical works including power line crossings Addendum/Corrigendum No. 3 & Pre-bid Meeting Minutes. |
| |
Apr 12 2010
Project Management Consultancy for Proposed provision of 4th line between Tiruvallur and Arakkonam – Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & thick web switches), Electrical (Railway Electrifi Bid Document |
| |
Apr 12 2010
Proposed Doubling of track between Dindigul and Villupuram – Execution of major and precast minor bridges from Villupuram to Ariyalur and from Valadi to Dindigul in Tiruchchirappalli Division of Southern Railway. Bid Document. |
| |
Apr 09 2010
Project Management Consultancy for Proposed new BG line between Obulavaripalle and Venkatachalam – Execution of earthwork in formation, bridges, road under bridges, station buildings, staff quarters, general electrical works including power line crossings Addendum/Corrigendum No. 2 |
| |
Mar 25 2010
RFP document of Bankability study for Railway Electrification of Nallapadu - Guntakal section including Gooty - Pendakallu section on South Central Railway. Addendum/Corrigendum No. 1, 2 & Prebid Minutes. |
| |
Mar 11 2010
Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails and Sleepers, Thick Webs Switches and Special Sleepers) S&T and OHE & General Electrical Work in Connection with Doubling Between Rajgoda–Tamluk (Junction Cabin) Addendum/Corrigendum No. 1. |
| |
Mar 11 2010
RFP of Bankability study of Burama-Chakulia New Line with upgradtion of Rupsa-Buramara BG line of S. E. Railway. Addendum/Corrigendum No. 1 & Prebid Minutes. |
| |
Mar 09 2010
RFP document of Bankability study for Railway Electrification of Nallapadu - Guntakal section including Gooty - Pendakallu section on South Central Railway. Bid Document. |
| |
Mar 08 2010
Construction of Roadbed, Major and Minor Bridges and Track Linking (Excluding Supply of Rails and Sleepers, Thick Webs Switches and Special Sleepers) S&T and OHE & General Electrical Work in Connection with Doubling Between Rajgoda – Tamluk (Junction Cabi Bid Document. |
| |
Mar 05 2010
Project Management Consultancy for Proposed new BG line between Obulavaripalle and Venkatachalam – Execution of earthwork in formation, bridges, road under bridges, station buildings, staff quarters, general electrical works including power line crossings Addendum/Corrigendum No. 1 |
| |
Feb 25 2010
Design, Supply, Erection, Testing & Commissioning of Supervisory Remote Control & Data Acquisition (SCADA) equipment on section between Nandalur (Excl) and Guntakal Jn (Incl) on Guntakal Division of South Central Railway. Technical Clarifications-II |
| |
Feb 25 2010
Proposed new BG line between Obluvaripalle and Venkatachalam – Execution of earthwork in formation, bridges, road under bridges, station buildings, staff quarters, general electrical works including power line crossings from Km. 00 to Km. 17 between Obula Bid Document. |
| |
Feb 24 2010
RFP of Bankability study of Burama-Chakulia New Line with upgradtion of Rupsa-Buramara BG line of S. E. Railway. Bid Document. |
| |
Feb 24 2010
Provision of 4th line between Tiruvallur and Arakkonam – Construction of roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & thick web switches), Electrical (Railway Electrification and General Electrification), signall Addendum/Corrigendum No. 3. |
| |
Feb 17 2010
Design, Supply, Erection, Testing & Commissioning of Supervisory Remote Control & Data Acquisition (SCADA) equipment on section between Nandalur (Excl) and Guntakal Jn (Incl) on Guntakal Division of South Central Railway Technical Clarifications. |
| |
Jan 27 2010
Mr. Satish Agnihotri has taken over as Managing Director of Rail Vikas Nigam Limited Mr. Satish Agnihotri has taken over as Managing Director of RVNL |
| |
Nov 11 2009
WALK-IN INTERVIEW FOR RAIL CRANE OPERATOR Please visit Career Opportunity page for details. |
| |
Sep 08 2009
Applications for the post of DGM, Manager, Asst Manager, Sr Executives and Executives in the Civil, Electrical and Signal disciplines.
Click here to view.
|
| |
Jun 02 2009
Empanelment of Doctors Empanelment of Doctors in Corporate Office, RVNL |
| |
Apr 06 2009
Revised results of Walk-in-Interview held at for engagement of Technical Supervisors and Technical Executives on contract basis. Revised Results for Technical Supervisors and Technical Executives. |
| |
Nov 20 2008
Vigilance Bulletin 2008
Please click here
to download.
|
| |
Apr 28 2008
Code of Business Conduct and Ethics for Board Members and Senior Management Personnel of RVNL. Code of Conduct.
|
| |
Oct 31 2006
POSTS FOR TECHNICAL PERSONNEL OF CIVIL, ELECTRICAL, SIGNAL & TELECOM DISCIPLINES ON DEPUTATION / OPPORTUNITIES FOR RETIRED EMPLOYEES Applications for Deputation/Re-deployment/Re-engagement. |
| |
Oct 16 2006
SHAREHOLDERS AGREEMENT, KRCL Obulavaripalle-Krishnapatnam Port New Railway Line Shareholders Agreement signed. |
| |
May 24 2005
Rail Vikas Nigam Limited Signs MOU for Haridaspur - Paradip New BG Rail Link ONE MORE STEP FORWARD IN PUBLIC PRIVATE PARTNERSHIP |  |
| |